My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
310
>
2900 - Site Mitigation Program
>
PR0544214
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 2:31:20 PM
Creation date
6/14/2021 11:33:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544214
PE
2960
FACILITY_ID
FA0025131
FACILITY_NAME
FORMERLY 424 VAN BUREN ST
STREET_NUMBER
310
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
137410020
CURRENT_STATUS
01
SITE_LOCATION
310 W FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBJECT: Well Abandonment Work Plan <br />Former Chase Chevrolet Property <br />424 North Van Buren St <br />Stockton, California <br />The following tasks will be completed pursuant to the abandonment of the Soil Vapor wells <br />installed at the future site of the Great Wolf Lodge, 2600 W. Yosemite, Manteca, California (see <br />figure attached). <br />Background <br />Soil vapor probes SV-1, SV-2, and SV-3 were installed using a nominal 3-inchdiameter <br />hand auger in accordance with procedures described in the Work Plan. Hand auger <br />boreholes were advanced within the unoccupied retail space on the north side of the parking <br />garage. Boreholes were advanced to 5 ft bgs, and a five-inch vapor probe was installed within a <br />one-foot sand pack interval installed between 4 and 5 ft bgs. The vapor probe implant was <br />attached to a 7-foot length of 0.25-inch diameter Nylaflow0 tubing and a Swagelok0-style valve <br />was attached at the opposite end. A well box was set in concrete on the unpaved surface. <br />TEST WELL CONSTRUCTION SUMMARY <br />Vapor Well <br />Inside <br />Tubing <br />Diameter <br />Total Depth <br />(feet bgs) <br />Screened Interval <br />(feet bgs) <br />SV-1 .25 5 4.5-5' <br />SV-2 .25 5 4.5-5' <br />SV-3 .25 5 4.5-5' <br />Task 1 - Permitting and Pre-Field Activities <br />Permitting and Utility Clearance <br />Woodward Drilling Company, Inc will coordinate for the preparation and submittal of the San <br />Joaquin County EHD well abandonment permit application and fees. <br />Prior to the well abandonment, the well locations will be marked in white paint on the pavement <br />near the well site. Underground Service Alert (USA) will be contacted at least three working <br />days prior to conducting field work to notify local utilities of the proposed subsurface work. USA <br />provides a partial location service free of charge for major utility lines. <br />Page 1 of 4 Feb 28, 2019 <br />Woodward Drilling Company, Inc. PO Box 336, Rio Vista, CA 94571 (9707) 374 — 4300 <br />wayne@woodwarddrilling.com
The URL can be used to link to this page
Your browser does not support the video tag.