My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:56:53 PM
Creation date
6/14/2021 3:15:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2005
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS-SLOPE BERM DESN April 18, 2003 Worksheet No. 1 of 3 <br /> SELECTION OF DESIGN STORM DURATION <br /> Used for maximum landfill run-off <br /> Procedure: Calculate concentration time based on longest overland path to the cross-slope berm. <br /> Time of concentration (TJ = design storm duration <br /> Time of Concentration (T,): <br /> Area I: 0.97 acres <br /> Area I1: 1.47 acres <br /> Area 111: 1.84 acres <br /> Area IV: 2.10 acres <br /> Total Area: 6.38 acres (see Drawing No. 1) <br /> Surface condition = Average Grass <br /> Overland Flow Time: <br /> Length ftSlope % Time (min) (1) <br /> Area 1: 95 6 11 <br /> 115 30 8 <br /> 19 <br /> Area 11: 165 6 13 <br /> 115 30 8 <br /> 21 <br /> Area 111: 185 6 14 <br /> 150 30 9 <br /> 23 <br /> Area IV: 165 6 14 <br /> 160 30 9 <br /> 23 <br /> Minimum Overland Flow Time = 19 min <br /> Use Tc= 15 min <br /> USE A 15 MIN. STORM DURATION <br /> (1) Source: VDH&T, Plate 5-1, attached <br /> N:\1 North County\NCDrainDesign.xls <br /> Sheet: DrainageDesign Printed:6118/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.