Laserfiche WebLink
SANAOAQUIN <br /> <br />Environmental Health Department <br />COUNTY <br />Greatness grows here. <br />PERCOLATION TEST/SOIL PROFILE INSPECTION CHECKLIST <br />SJC Ordinance Code, Title 9, Section 9-1105.2 <br />EHD Policy for Percolation Test Procedure 98-01 <br />Site Location: cc -b_l ---S-0,ck._ -Grit Aci Date: IP 5/2 1 <br />Test Performed by: 1(t c-K Permit#: S. 12443 092_ PA#: <br />SITE MAP <br />Includes perc test and soil profile locations with accurate measurements from a fixed reference point (must be able to locate <br />the test hole areas in the future). Perc/soil profile holes must meet distance setbacks as noted in the sewage standards for <br />septic system locations. Percolation test holes and soil profile pits must be conducted in the area proposed for future septic <br />systems. <br />Notes any changes in elevation on the subject property. <br />Notes all water wells. <br />Notes all man-made features (septic systems, drives, barns, outbuildings, animal pens, etc.) <br />Notes all natural features (ephemeral drainage courses, large stands of trees, ponds, rivers, etc.) <br />PERC TEST PREPARATION PROTOCOL <br />Date and time of test hole preparation. <br />\--Diameter and depth of test hol 4" 2" diameter and 36" it epth). <br />Dimensions and depth of deep test hole (4"-12" diameter and 42%25' or minimum 10' above seasonal high water table). <br />'-. Test hole preparation (scoring of sidewalls, removal of loose material). <br />Weather conditions at time of testing (raining, windy, etc.) <br />1/ Soil type and condition encountered in test hole. <br />l...-' Addition of 2" of course sand or fine gravel to test hole. <br />'`.- Pre-soak by addition of minimum 12" of water over gravel (24-hours before test). <br />Fpc TEST CONDITIONS, MEASUREMENTS, AND REPORTING <br />'t ondition of test hole after the 24-hour pre-soak (amount of water remaining in the hole, any soil sloughing noted). <br />"\-. rect amount of water used to refill hole (6" over gravel). Documented on the recordation sheet. <br />Description of type of perc test procedure used based on conditions (Procedure #1, #2, o . —1, S kW 421- <br />(..Accurate recordings of drop and refill of water in same J V-7 measurements. <br />t../.— 'roe fixed reference point used for each reading. Description of reference point used to be included in the final report. <br />y_31.th calculations checked for accuracy. <br />V -Beginning and end measurements of the last reading verified by RENS. All above reviewed and verified by RENS. <br />SOIL PROFILE <br />Description of the date, time, and protocol used to prepare soil profile pit. <br />Description of soil profile pit including depth and dimensions. <br />Soil lithology described by appropriate professional using industry standard protocol. <br />COMMENTS /r) <br />rerr_ r?erte- • tO <br />l'e, 40 (e_ ke/94 rir:i <br />ei t-,1 h l'Aga, <br />so 1 1„..e_e_ckil. til-e- ve 714-ka---N <br />(---- <br />REHS Name: Of' i e— A-co kt-Jie-X-;\ c•-__. <br />Calculations Examples: <br />Last drop reading = .07' over 30 minutes time. <br />.07' x 12" = .84" (convert from feet to inches) <br />30 minutes ÷ .84" = 35.7 minutes/inch <br />Last drop reading = 1.2' over 10 minutes time. <br />1.2' x 12" = 14.4" (convert from feet to inches) <br />10 minutes ÷ 14.4" = .69 minutes/inch <br />1868 E. Hazelton Avenue I Stockton, California 95205 I T 209 468-3420 I F 209 464-0138 I www.sjcehd.com