Laserfiche WebLink
mn Lineage <br /> II Form <br /> E. Immediate Counter Measures <br /> What?: How: <br /> • The FMM re-tightened the valve (PR-2,33) and the gland • FMM performing <br /> packing nut and was able to stop leak. troubleshooting. <br /> • Order replacement parts for the gland packing nut. • FMM ordering the parts. <br /> Who?: FMM When?:Today 04/09/2021 <br /> F. Long Term Countermeasures: Responsible: Date:05/07/2021 <br /> • Replace of the gland packing nut parts, as per OEM Jerry Jastrem <br /> specifications. FMM <br /> • Review OEM recommendations for gland packing <br /> maintenance and regular replacement intervals. <br /> • Review the applicable procedures (i.e. <br /> operating/maintenance procedures) for alternating <br /> ammonia pumps). <br /> G.Sustainment Checks 30/60/90: Responsible: Date:07/09/2021 <br /> Follow OEM Recommendation and safety programs and Jerry Jastrem <br /> procedures. FMM <br /> Page 5 of 5 <br />