Laserfiche WebLink
2. Loading areas. <br /> 3. Storm and sewer drains. <br /> 4. Access and exit points from the street. <br /> 5. Evacuation assembly area. <br /> 6. Emergency response equipment (fire extinguishers and spill control). <br /> 7. Emergency shutoffs. <br /> 8. The actual locations of the thread oil, oxygen, and acetylene in the counter area. <br /> 9. The topographical information on the map is not accurate and does not show the entire facility/site and <br /> the structures attached to the north side of the facility. <br /> A site map shall contain a north orientation, loading areas, internal roads, adjacent streets, storm and sewer drains, <br /> access and exit points, emergency shutoffs, evacuation staging areas, hazardous material handling and storage areas, <br /> and emergency response equipment. If a site map element is not applicable for your facility then list it on the map and <br /> label as "NA". <br /> • Violation #7, Emergency Response/Contingency Plan is not complete (see attached). <br /> 1. Section E—the location(s) of the emergency assembly area has not been identified. <br /> 2. Section G.the locations of the emergency equipment(fire extinguishers and spill control) have not been <br /> identified. <br /> • Violation #8, Employee Training Plan is not adequate. <br /> - The training plan does not the following elements: <br /> 1. Immediate notification contacts to the appropriate local emergency response personnel and to <br /> the unified program agency. <br /> 2. Evacuation plans and procedures, including immediate notice, for the business site. <br /> - A training plan must address training for all new employees and annual training, including refresher <br /> courses,for all employees in safety procedures in the event of a release or threatened release of a <br /> hazardous material, including, but not limited to: <br /> 1. Familiarity with the emergency response plans and procedures in the event of a release or <br /> threatened release of a hazardous material. <br /> 2. Immediate notification contacts to the appropriate local emergency response personnel and to the <br /> unified program agency. <br /> 3. Procedures for the mitigation of a release or threatened release to minimize any potential harm or <br /> damage to persons, property, or the environment. <br /> 4. Evacuation plans and procedures, including immediate notice, for the business site. <br /> As an alternate to uploading a separate employee training plan; you may refer to the training elements outlined <br /> in Section I of the Emergency Response/Contingency Plan template provided in CERS. This is accomplished by <br /> discarding the uploaded document, choosing "Provided Elsewhere in CERS'; then choosing "Emergency <br /> Response and Training Plans'. <br /> • Violation #11—Records showing the employees have received training in the following elements have not been <br /> received (see sample employee training record). <br /> 2 <br />