Laserfiche WebLink
SAN 10AQUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> COUNTY USE PERMIT <br /> Greotness grow-, here. <br /> FILE NUMBER: <br /> Airport Land Use Commission <br /> Within an Airport Yes[kNo ❑ Includes structure over Yes E] No ❑■ ALUC fees paid? Yes❑ No ❑ <br /> Area of Influence? 200 feet in height? <br /> OPERATIONS <br /> Employees/Customers/Deliveries per Work Shift <br /> Attach additional sheets as necessary) <br /> Average Average Average <br /> Das of Number of Employees Number of Customers Deliveries/ Seasonal <br /> Shift# Shift Hours Operation Per Shift Per Shift Shipments Per Shift Or Year- <br /> Existing Proposed Existing Proposed Existing Proposed round? <br /> #1 <br /> #2 SEE ATTACHED SHIP T SCF EDUL <br /> #3 <br /> #4 <br /> Surface Transportation Assistance Act(STAA) <br /> Will STAA type trucks, over California Legal length, be used as Existing route Yes❑ No ❑ <br /> part of the proposed operation?Yes❑ No <br /> Note:Contact the Department of Public Works for information regarding STAA routes at 209-468-3000 <br /> Buildings and Structures <br /> (This information must be shown on the Site Plan) <br /> Structure <br /> Number(as Number of Square Total <br /> shown on Proposed Use(s) Floors Footage per Square Building Height Occupancy <br /> Floor Footage <br /> site plan) <br /> E1 Church Classrooms and Offices 1 6,400 6,400 20' Assembly/office <br /> E2-E5 (4)Modular Classroom Buildings 1 1,152 each 4,608 15' Education <br /> E6 Maintenance/Shop 1 1,600 1,600 20' S-2 <br /> E7-E8 Residence&Detached Garage 1 3,564 3,564 20' SF Residence <br /> 1,2A,2B Auditorium/Multipurpose Building j 1 33,000' 33,000" 35' Assembly <br /> 2C Classroom Building 2 7,500^ 135' Assembly/Education <br /> 'includes Phase 1 and 2 building areas <br /> ^Phase 2 <br /> Page 2 of 6 <br /> Updated 09/01/2020 <br />