My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014171
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000267
>
SU0014171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 10:54:25 AM
Creation date
6/24/2021 1:31:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014171
PE
2611
FACILITY_NAME
PA-1000267
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391-
APN
20917003, 25804001
ENTERED_DATE
5/21/2021 12:00:00 AM
SITE_LOCATION
18500 S Henderson RD
RECEIVED_DATE
5/20/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38. The applicant shall submit for MHCSD approval a Construction Truck Management Plan for <br /> construction activities, prior to any construction. <br /> 39. The applicant shall perform a traffic signal warrant study and comply with the results of the study, <br /> installing traffic signals where they are warranted. The applicant shall also install or bond for the <br /> signals that are within the tentative map area but are not warranted at the time of filing a final map. <br /> 40. Install a traffic signal at Mascot and Central Parkway prior to the issuance of the 1200th building permit <br /> beyond "E","F", and "G". <br /> 41. Install a traffic signal at DeAnza Boulevard and Central Parkway prior to the issuance of the 1500th <br /> building permit. <br /> 42. Install a traffic signal at Great Valley Parkway and Kelso Road prior to the issuance of the 16701h <br /> building permit beyond "E", "F", and"G". <br /> 43. Fund as determined by MHCSD, a traffic signal at the intersection of Grant Line Road and Altamont <br /> Pass Road and the addition of one lane on each approach to the Grant Line Road prior to the issuance <br /> of the 22501h building permit beyond "E", "F", and "G". If Alameda County does not allow these <br /> improvements, the improvement funds shall be deposited with the MHCSD to be used as directed by <br /> the General Manager as described in the TIF Program. <br /> 44. Subject to the requirements of the Mountain House Transportation Improvement Fee Technical report <br /> adopted by the MHCSD Board of Directors on April 11, 2000, and all amendments thereof to date, <br /> widen or fund, as determined by MHCSD, Grant Line Road to four lanes from Great Valley Parkway <br /> to 1-580 freeway prior to issuance of the 22501h building permit beyond"E","F",and "G".The developer <br /> shall improve and widen Grant Line Road between the Alameda County line and its intersection with <br /> 1-580. If Alameda County does not allow the improvements to Grant Line Road, the developer shall <br /> deposit with the MHCSD, funds equivalent to the cost of the widening as listed in the TIF Report. The <br /> MHCSD General Manager may use the funds to improve other regional roads as determined by a <br /> traffic study and stated in the TIF technical report and approved by the MHCSD. If Grant Line Road <br /> in Alameda is not widened, an interim design showing the transition from 4 lane to two lane within the <br /> boundary of Mountain House shall be submitted to the MHCSD for review and approval. <br /> 45. Prior to the issuance of the first residential building permit north of Byron Road, one of the three <br /> permanent Byron Road crossings shall be constructed. Prior to the issuance of the 13001h residential <br /> building permit north of Byron Road, the second permanent Byron Road crossing and the Railroad <br /> crossing shall be constructed. Prior to the issuance of the 2700th residential building permit north of <br /> Byron Road, the third permanent Byron Road and the second at grade railroad crossing shall be <br /> constructed. If at any time, frequent, regularly scheduled train service is established on the Union <br /> Pacific Line along Byron Road, no further Final Subdivision Maps will be approved until the Central <br /> Parkway overpass is complete and operational. <br /> 46. All street improvements along Byron Road from East boundary of the MHCSD to the west boundary <br /> of the MHCSD shall be constructed to its full and final design as indicated on the Master Plan and the <br /> latest MHCSD standards. Timing shall be consistent with Community Approvals as determined by <br /> MHCSD. <br /> 47. All streets within the development and as shown on the Tentative Map shall be improved by the <br /> developer according to the following: <br /> 48. If the property shown on the Tentative Map is to be developed in phases, then a Subdivision <br /> Agreement and appropriate bonding shall be executed between the MHCSD and the developer for <br /> each phase, prior to the approval of the Final Map. <br /> PA-1000266—Conditions of Approval 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.