My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
444
>
2300 - Underground Storage Tank Program
>
PR0231692
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 12:46:58 PM
Creation date
6/28/2021 9:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231692
PE
2361
FACILITY_ID
FA0000212
FACILITY_NAME
Mossdale Chevron
STREET_NUMBER
444
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
444 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Ins ection Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (One OPE per column) 87 91 DSL <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? E No E No E No ❑ No <br /> OPE Model OPW OPW OPW <br /> Tank Manufacturer Mod Weld Mod Weld Mod Weld <br /> E Shuts off E Shuts off E Shuts off ❑ Shuts off <br /> Flow Flow Flow Flow <br /> What is the OPE response when ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> activated? Flow Flow Flow Flow <br /> (Check a#that apply.) ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> piping that may interfere with the OPE E No E No E No ❑ No <br /> operation? <br /> At what level in the tank is the OPE set to 100" 100" 100" <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank in 95% 95% 95% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition E Yes E Yes E Yes ❑ Yes <br /> to respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results E Pass E Pass E Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.