Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> - • - - <br /> 5ite Address GREWALS TS GAS d LIQUOR 4100 FREMONT STREET STOCKTON CA 95215 <br /> FREMONT STREET N <br /> . . . . . . . . . . . . . . . . . . . . . _ . . . . _ . . . . . . . . . . . . . . . . . . . . . . - 1111 . . . <br /> 87. <br /> 91 . 7 . <br /> X <br /> . Q <br /> . - O <br /> L RT <br /> DIE , . . . . <br /> . . . 1 . 0 . 1 . . . 1 . . . . . <br /> ICEY <br /> F = FILLS <br /> T = TURBLYE <br /> *PPVG + P = PROBE <br /> DraivinE of piping V = VAPOR <br /> exit of sump and aTG Y = SIAEP SENSOR <br /> UDC' s. No L = LeakDetector <br /> underground A1 = Dlanu�- <br /> drauang is STORE B = Brine Sensor <br /> 4WjgAt& the I = Smart Sensor <br /> cannot speculate S = STP <br /> blue prints. C = Rost, 8i Chains <br /> E = E Stop <br /> A?W itemr underground Y;= are not visible to the c r7)- -fng techrticfart are a <br /> prgfksional opbtion o/tb, and areSolstilfor ntfarntatiortal purposes. Ihmvir{g <br /> nor to Scald <br /> Date map was dram: 442-19 <br /> Instructions <br /> If you already have a diagram that shows all required information• you may include it, rather than this page, with your Monitoring System Certfication. On your site plan , <br /> shove the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors mon;torng tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />