Laserfiche WebLink
l <br /> 2019 <br /> Monitoring System Certification <br /> l / �AII=I �ALTH <br /> UST Monitoring Site Plan LN V I �tUNM NTALat <br /> Site Address: GREWALS 76 GAS & LIQUOR 4100 FREMONT STREET STOCKTON CA 95215 <br /> FREMONT STREET 1 N <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> x x <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . 87. . . . . . . . . . . <br /> T <br /> . . . . . . . . 91 . T <br /> L x <br /> x <br /> x <br /> ISIII x <br /> . . . . . . . . . . . . . . . . . . . . L u . . . . . . . . . . . . . . <br /> x <br /> . . . . . . . . . . . . . DIE . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . KEY <br /> . . . . . . . . . . . A = ANNULAR <br /> *PIPING * F = FILLS <br /> (ARROWS) T = TURBINE <br /> Drawing of P = PROBE <br /> piping exit of V = VAPOR <br /> sump and UDC 's. ATG X = SUMP SENSOR <br /> No underground L = Leak Detector <br /> drawing is M = Manway <br /> accurate, we STORE B = Brine Sensor <br /> cannot speculate I = Smart Sensor <br /> blue prints. S = STP <br /> C = Floats & Chains <br /> E = E Stop <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map was drawn : 4-12-2016 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping . Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21 /07 <br />