My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 10:44:44 AM
Creation date
6/28/2021 4:36:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231765
PE
2361 - UST FACILITY
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
Stockton
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
3300 Waterloo RD Stockton 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST INSTRUCTIONS Socket PREVENTIVE MAINTENANCE Good Valve <br /> POPPET & FLOAT MOVEMENT adaptor Annually, inspect the flapper In the 71 SO to see that )tis - \ \ Deflection Shield <br /> FOR TESTABLE MODELS ONLY open by looking down the drop tube opening (see In- <br /> spection procedure below). Testthe 71 SO drop tube ' urith Poppet <br /> TOOLS NEEDED FORTESTING: seals with CARIB procedure TP-201.ID. If the drop tube protected <br /> 1. 1/40 square drive extension or3/8' square drive ex- seal passes testing, no further maintenance Is required. <br /> tension with 3/8* to 1/4w socket adapter. a If the drop tube fails testing, replace the drop tube seal <br /> 2. Torque wrench / 1/4' or 3/8' square drive ratchet with DPW P/N: HI1931M for 40Tubes, Re-testthe71SO <br /> wrench. drop tube with CARB procedure TP-201 .1 D. The lower <br /> 3. Pipe dope. 0 tube o-ring seat OPW P/N: HI 4840M can also be re- <br /> 4. Flashlight (optional). placed. If this does not correct the leak the 7150 needs <br /> Open Poppet Closed Poppet to be replaced. <br /> Bad Valve <br /> TEST STEP 1: <br /> Test Figure 1 <br /> Remove spill container cover and fill cap from fill adapt- FOR TESTABLE MODELS ONLY: The socket adaptor I Deflection Shield <br /> er and look down Into the tube and make sure no debris Pull on extension and can be removed and poppet and float movement and With Poppet exposed <br /> or foreign objects are present. if debris or foreign ob- socketadaptor function inspected without removing the valve. See <br /> jects are present take appropriate steps before proceed- — Page 17 for full testing details. if replacement parts a re <br /> Ing. Look down Into the tube and ensure poppet is needed for testable models the following Items are <br /> completely protected by the deflection shield. See Test ��a available; OPW P/N 206741 Testable lnletTube S/A, <br /> Figure 1. If poppet is exposed and tank is not full the %" r--- - 206740 Socket Adaptor and Cable Assembly, and 6150K . � <br /> overfill valve should be replaced. A flashlight may help i l - -0001 Float Kit I Tj <br /> when inspecting the tube. I - _ Figure27 <br /> '\ CAUTION: Do not insert any foreign object Into drop <br /> TEST STEP 2: _ tube if flapper is in the closed position. Forexam- Note: Figure 27 shows poppet location with float arm <br /> Unthread the socket adaptor assembly from the Inlet `'� , � ple, a tank level measuring stick. This will damage notactivated. <br /> tube using a 1/40 square drive extension and wrench. the valve and void the Warranty. ALWAYS check <br /> The extension will attach to the socket adaptor, Secure flapper location before "sticking" the tank if flap- INSP 4. Inspect the float by lifting upward. The float <br /> all tools to ensure they don't fall into the tank orvalve. per is in the closed position, the tank is either over- should move freely without any binding. See Figure <br /> With the extension still attached pull on the socket -----_ _ filled and you need to wait until the liquid level goes 28• <br /> adaptor and cable assembly and ensure float and pop- down or the 7l SO is damaged and needs to be re- _ <br /> pet move / function properly. It should only require 3' --_-�-_—_ .� _ Y placed, <br /> to4' ofmovementand less than 5 lbsofforce In order - Open <br /> Inspection Procedure to Ensure Proper Operation <br /> to actuate the float and poppet When looking down <br /> Into the uppertube ensure poppet is visible and moves / Note: For testable models valve does not need to be _ <br /> Into the flow path (seeTest Figure 1 & 2) whensocket Open r I removed from tank See page 17 for testable instruc- - � <br /> adaptorIs pulled and resets properly when socket adap- Poppet t Closed I tons. <br /> for is released. If poppet does not actuate freely take Poppet Floatmoves INSP 1, Remove the overfill valve from the tank as de- _ <br /> appropriate steps to correct. I up scribed in step 26. Float <br /> TEST STEP 3: <br /> INSP 2. Visually inspect the valve for damage. Make <br /> Apply pipe dope to the socket adaptorthreadz Pipe sure no debris or foreign objects are In or on the valve. <br /> dope should be a non-hardening gasoline resistant pipe INSP 3. With the float in the normal (down) position, Figure28 <br /> thread seal compound. Make sure poppet and float visually Inspect the valve to ensure the poppet is not <br /> have reset properly and are not visible then Install sock- I I I ( exposed outside the deflection shield. See Figure 27. INSP S. View down the tube to ensure the poppet is <br /> et adaptor and torque to 3.5 ft-lbs (421n-lbs) minimum <br /> to 5.0 ft-Ibs (60 In-lbs) maximum. After Installing socket moving into the flow path when lifting the float, See <br /> adaptor, to ensure vapor tightness, OPW recommends Figure 29. <br /> conducting pressure testing perCARBTP201 .1D. Some TestF1gure2 <br /> areas may require pressure testing of overfill valve per <br /> CARB TP201.1D to ensure valve is vaportight. lithe <br /> drop tube fails pressure testing it may be necessary to <br /> check the seal at the poppet adaptor threads. Reinstall <br /> All cap and spill container cover after testing. <br /> 17 18 <br /> C <br /> Appendix A <br /> C10sed 7150 Overfill Valve UpperTube Calculation Worksheet <br /> 1 Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br /> _ Desired tank capacity for shut-off: SO%= <br /> Dipstick Number on Tank Chart that corresponds to 100% volume (Y) - m <br /> - — Dipstick Number on Tank Chart that corresponds to SO% (X) = — O <br /> F19ure29 Upper Tube Reference Number Z=Y-X (Z) <br /> 2 <br /> INSP 6. If there is no apparent damage or restrictions UpperTube Depth Inside Tank C = Z-2' <br /> reinstall the valve per the above instructions and test 0 (C) <br /> per local requirements. Distance from top sealing surface for 7150 Lip' to inside the <br /> top of Storage Tank' A= <br /> 7150 Performance Specifications <br /> This Overfill Prevention Valve has been manufactured <br /> and tested to, and met, the following California specifi- <br /> cations. Performance Requirement: Leakrateto be less In all cases for non-testable 7150 models, the top of the valve body must protrude at east 6 '%0 Into the tank to <br /> than or equal to 0.17 CFH@2.0' W.C. provide a minimal clearance for proper operation' Additionally the total UpperTube Length must beat least 16' <br /> of length to Include the protective bend In the tube. <br /> Torque Specification <br /> Taptfte Screws, #10-24 thread cutting, 20 in-lbs mini- IsCless than 634' Yes No <br /> / <br /> mum to 351n-lbs maximum. Testable Models Only: <br /> Socket Adaptor, 1/4' NPT, 3.5 fir-lbs (421n-lbs) minimum If NO, Upper Tube Length (D)= C + A <br /> to 5.0 ft-lbs (601n-lbs) maximum. <br /> If YES, UpperTube Length (D)= 6 S4 '+ A <br /> IMPORTANT: Leave these installation instructions Upper Tube Length = <br /> and maintenance procedures with the station opera- <br /> tor. <br /> For Testable 71 SO models only <br /> In all cases for Testable 7150 models, thetop of the valve body must protrude at least 634' Into the tank to provide <br /> a minimal clearance for proper operation' Additionally the total UpperTube Length must beat least 1434' of <br /> length to Include the protective bend in the tube. <br /> Is C less than 5' Yes / No <br /> If NO, UpperTube Length (D)= C + A - 1 34 ' <br /> If YES, Upper Tube Length (D) = 634' + A- 134 ' <br /> Upper Tube Length = <br /> ' Sealing surface maybe the top ofthe Face5ewlAdapror, the built inseating/edgebuidesomespillcontainersnronran- <br /> wportightapplkarfonstbe top ofthepoenipple <br /> ' Some UndegroundSrotage tardsral0ea man ysysematthe top. Makesue to use the topofthestorage tankfor <br /> measurementandnottotopofthemanway. Comuhyoufundegrourdtankmanufactumrfarheightofthemanw y <br /> Thismeesu ementirtaken from theseam where the uppertube hattachedto the ralwbodyto theinsHeofthe tanktop. <br /> 19 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.