Laserfiche WebLink
5) Dipstick number (X) = 82' top of the Face Seal Adaptor In the spill container to the Tape measure IMPORTANT: Remove all chips and shavings generated <br /> Tank diameter (17 = 92' bottom of [betook (Dim. 08'). In steps 3 thm 5 out of the cut end of the tube. DO NOT <br /> M - (X) = (Z) (92' - 82' = 101 IMPORTANT: Inspect the riser pipe for any foreign ma- remove chips and shavings by dumping thru valve <br /> (Z) = 10' terial. Over spray from tank relining or any internal body' <br /> 6) (Z) - 2' = C (10' - 2' = 8') burrs inside of pipe must be removed prior to Installa- MarkUpperTube <br /> C=8' tion. Failure to have an unobstructed riser pipe may STEP 4: FILE THE UPPER DROP TUBE <br /> prevent proper Installation and operation of the valve. File(Cut Line) <br /> 7j Is 80 less than 6-1/2'7 The71S0 is designed for Installation Into schedule 40 Seam - rougheupper tube sure the <br /> dremat and se any quare. <br /> rear <br /> rough edges. Make sure the cutis flat and square. <br /> riser pipes. The 71 S0 cannot be installed Into schedule Figure2 <br /> NO Measure the distance from the top of the FSA- BO riser pipes. IMPORTANT: Carefully file a good chamfer on the in- <br /> 400Face Seal Adaptor Installed onthe riser pipe STEP 3: CUTTHE UPPER DROP TUBE side edge of the drop tube to provide a lead-In for the <br /> STEP 2: MARKTHETUBE <br /> to the Inside, top lip of the storage tank and ob- polypak seal and inlet tube installed in Step 8, <br /> tain measurement (A). Use the result from Step i and HOWTO LOCATE THE Attach the supplied band clamp to the upper tube just <br /> POSITION OF THE71SO AT9596 TANKCAPACITPto below the mark and ensure that it is assembled square <br /> Upper tube length = C + (A) mark the upper tube. Measure the distance from the tothetube. The clampcan be used asa guide for mak- <br /> seam where the upper tube and valve body meet Use Ing a square cut. If a vise is used, clamp on the valve <br /> Fortes table models only, ending in 'T': Upper Tube a tape measure to mark the calculated upper tube body casting only to avoid damage to the float and <br /> Length = C + (A) - 1 -112" length onto the upper tube. See Figure 2. tubes (See Figure 3A). Carefully saw through the tube <br /> squarely, at the mark made to Step 2. Use a hacksaw <br /> ASSEMBLY INSTRUCTIONS Tape measure with a new fine-tooth blade. Rotating the upper tube <br /> as the sawing progresses will minimize run out and en- <br /> sums square 90-degree cut. Remove the band clamp <br /> IMPORTANT: Each of the numbered steps in the Instal- ahertubeiscut <br /> lation instructions are designed as a CHECK LIST to en- CAUTION - DO NOT use a pipe or tubing cutter to cut <br /> sure proper installation and trouble free operation of the upper drop tube, this may damage the tube, m haemnd ee <br /> the OPW 71 SO Overfill Prevention Valve. causing it to be out of round thereby prohibiting <br /> Read and follow these steps carefully, checking them Ris Rpa assembly of the unit. <br /> off as you proceed. cash Feca (Ae <br /> Seal AdapW Toi nk (Be figure4 <br /> Figure numbers correspond to step numbers for easy TaPO.0) ToT rt NN <br /> reference. mm `\\ STEPS: SANDTHt UPPER DROP TUBE <br /> Sand the Inside of the drop tube with sandpaper and/or <br /> STEP 1: MEASURE steel wool to remove all burrs and sharp edges. After <br /> sanding wipe down the Inside ofthe tube with a clean <br /> Install the OPW Face Seal Adaptor and the OPW Thread- rag from the top to approximately 4 inches down to <br /> on Spill Container on the Fill Riser (Refer to the Installa- / remove any debris. <br /> don Instructions Supplied with the Spill Container). In- Figure <br /> sertatape measure through the riser pipe and hook it Caution: Failure to properly chamfer, sand, and <br /> under the inside of the tank in the lengthwise direction, clean the drop tube may cut the seal and result in a <br /> Measure the distance from thetop ofthe Face Seal failure of a pressure decay leak test. <br /> Adaptor threads inside the base of the spill container <br /> bucketjust below the drain valve outlet window to the 4• PP1 I Figure3A <br /> Inside, top lip of the storage tank (Dim. OW) (See Figure Np* <br /> 1 &1A). <br /> The top flange on the 7150 will rest on the Face Seal <br /> Ada ptorjust below the drain valve outlet, and be / <br /> locked in place between the Face Seal Adaptor and the _ ]K.k 4' nipple that Is installed In the spill container with the Jack Screw Kit (See Figure lA). (Forriser pipe configu- k7msuamh rations other than that shown, consult installation lauzk laaw drawings or use other necessary means to measure Dl- habitation ®menzion 'A'). al Face <br /> Seal Adaof <br /> ptor)Using a tape measure, measure the distance from the 7150 cu urc Figure <br /> Figure 7A 5 F1gure3B 6 <br /> 7150-TOOL PROCEDURE BELOW, STEP IDA: TIGHTEN THE 7150-TOOL <br /> STEPS: APPLY GREASE TO DROP TUBE FOR 7150-TOOLC, SEEPAGE 9 Use the three view holes to ensure that the tool seats <br /> Apply black moly grease to the Inside diameter of the FOR 71 S0-TOOLCT, SEE PAGE IO out flat against the top of the inlet tube. To prevent <br /> upper drop tube. Make sure coverage Is completely vertical movement of the tool during drilling, hand <br /> around the tube as shown in Figure 6. Note: 71 SO-TOOL can only be used with testable tighten all three knobs evenly to the upper drop tube. <br /> overfill valves if modified as shown below. A 2' See Figure l OA. <br /> / wide slot must be added to accommodate cast lug. <br /> STEP IIA: PREPARE DRILLAND BIT <br /> Add rwide Confirm that the stop on the 3/16' drill bit supplied <br /> slot to use with with the 7150-T0OL Is in the correct position before <br /> ' drilling. The stop lsfactory Installed atadistance be- <br /> testabievalves tween 24 to 2-1/16' from the tip with the 7150-TOOL. If <br /> the stop is not at the correct position It must be fixed <br /> Figure 8 before drilling. <br /> NOTE: Testable inlet tube must have cable port in CAUTION: If the drill stop is not in the proper loca- <br /> linewithfloat. Testable inlet tube bottoms out an tion failure of pressure decay leakiest may result, <br /> stop, it does not bottom out on inletflange. r" ' tion <br /> 0 <br /> Fig- <br /> ureSA <br /> Figure6 <br /> STEP 7: APPLY GREASE TO POLYPAK SEAL 7150-TOOL Modifications forliestable Inlet <br /> Ensure that the polypak seal is Installed on the inlet <br /> tube with the lip up as shown in Figure 7. Apply black STEP9A: INSERT 715O.7001. 0VER INLET TUBE <br /> moly grease to the polypak as shown. Make sure cover- To Install the 7150-TOOL (sold separately) over the inlet <br /> age is completely around the polypak seal. I tube, first loosen all three knobs, so the too) can pass Tip to stop dimension must be <br /> freely over the inlet tube flange. Align the slot on the 24 to 2-1/16'. <br /> Ensure polypak Cable port must be in tool with the key on the inlet tube and insert the tool Figure 17A <br /> lip Is up line with float down. See Figure 9A. 9 <br /> /c <br /> ` Lowen tl Hand STEP 72A: DRILLHOLES <br /> blet , \y TOas� <br /> knobs wewndes tighten drill a he 3/1 0dialet tube and le In -TOOL in the upperuplace, carefully <br /> ,Pubo I >dypk �� "1�6*bl drill a3/16' diameter hole In the upper tube using the <br /> r " drill bushing in the knob as a guide. The drill stop Is po- <br /> / `� / sltioned so itwill bottom out against the knob afterthe <br /> - - - / Figure BA bit has drilled through the upper drop tube. Ifthestop <br /> ---�"' <br /> Testable Models Only Is positioned wrong either no hole will be drilled, or a <br /> through hole could potentially be drilled through the <br /> _ Q I <br /> inlet tube, If no hole is drilled return to step 11 A and <br /> Apply greasecheck the stop dimension. If a hole Is drilled through <br /> amundpolypak SEE PAGE B FOR INSTRUCTIONS USING THE 71 SO- _ O the Inlet tube or Into the screw hole the assembly is not <br /> TOOLa bier salvageable. Drill (2) more holes In the two remaining <br /> Figure � knobs. <br /> SEE PAGE 9 FOR INSTRUCTIONS USINGTHE7150- <br /> STEPS: INSTALL INLET TUBE TOOLC. <br /> Insert the inlet tube Into the upper tube until the upper <br /> tube seats against the flange on the Inlet tube. Ensure SEEPAGE IO FOR INSTRUCTIONS USING THE71S0- <br /> polypak isInserted evenly and stays In inlet tube OOLC . 7 <br /> groove. Note: TOOLCtestable 7150modehending w7rTrequire the ; 1l <br /> 7150-TOOLRar modified7150-TOOL or or7150- TOOL[ - Drill wruupper \J <br /> Figure 9A Figure 70A tube beomy <br /> Figure 12A <br /> 7 8 <br />