My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:54:03 AM
Creation date
6/29/2021 9:05:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program Element: 2308 - UST RETROFIT <br />Telephone: (408) 391-8821 Requestor: KELLY SKURLA, BALCH PETROLEUM <br />Inspection Type: 298 - UST RETROFIT REPAIR INSPECTION <br />Address: 5655 Hood WAY , TRACY 95377 <br />Date: 09/10/2021Name of Facility: FedEx Ground - Tracy <br />Underground Storage Tank Program Service Request Inspection Report <br />Time Out: <br />Time In: <br />Request #: SR0084100 <br />Environmental Health Department <br />Onsite Service Technician: Robert Henninger ICC Service Tech/Installer Exp. Date: 05/03/2023 <br />Manufacturer training: OPW, 04/07/23 <br />OVERALL INSPECTION NOTES AND COMMENTS <br />NOTES <br />On site for overfill prevention installation for the diesel 1 north, diesel 2 middle, and biodiesel underground storage tanks. <br />Verified the following: <br />-measurements and calculations are set to 95% or lower <br />-use of correct tank charts <br />-functionality of fill tube shut-off valves <br />-Per technician Robert Henninger, ball floats are not installed. <br />This site is approved to received fuel in the diesel 1 north, diesel 2 middle, and biodiesel tanks. <br />To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having them <br />sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate ($152). To schedule an <br />appointment, please call (209) 468-3420. <br />The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br />Safety Code. If a reinspection is required, fees will be assessed at the current hourly rate. <br />Received by: Name and Title: <br />EH Specialist:Phone:(209) 616-3028 <br />Emailed to Kelly Skurla, Contractor <br />VICKY VANG-LEE <br />Page 1 of 1EHD 23-01 Rev. 09/16/2020 Underground Storage Tank Program Service Request Inspection Report <br />FA0023065 SR0084100 SC298 09/10/2021
The URL can be used to link to this page
Your browser does not support the video tag.