Laserfiche WebLink
RECEIVED BY EHD: <br /> 7/27/2021 <br /> (received via Crompco Vault Portal) <br /> 7. Brine lens:isa"high liquid"alarm activated with sensor upside down? r: YM (' NO <br /> If No, provide additional information: <br /> 8. During check out, did a Ryder Filepresentative confirm that all communication is YES r- NO <br /> functioning properly? <br /> If No, provide additional information: <br /> 9. Isthe overfill alarm visible and audible at the tank fill point(s)and operating properly at 900/o? (If the HLAisnot <br /> programmed to activate at 90%select NIA and note below) <br /> r, YES c, NO a, N/A <br /> If No or N/A, provide additional information:tanks have flappers <br /> 10. Isthe overfill alarm visible and audible at the tank fill point(s)and operating properly at 950/o? (If the HLAisnot <br /> programmed to activate at 959lq select NIA and note below) <br /> r' YES c, NO a, NF A <br /> If No or N/A, provide additional information: <br /> In—Tank Gauging/Probe: <br /> 1. Has all wiring been inspected for proper entry and termination, including testing for ground vaults? (Visual <br /> inspection without disesss-mb/y of. boxy seal off,or use of mega ohm meter etc) <br /> � YB NO <br /> If No, provide additional information: <br /> 2. Any signs of cracking and swelling on tank gauge probes? YES NO <br /> If yes, describe signs: <br /> WO# 2335977 <br />