Laserfiche WebLink
RECEIVED BY EHD: <br /> UNDERGROUND STORAGETANK 7/27/2021 <br /> MONITORING SYSTEM CERTIFICATION FORM (Page I(received via Crompco Vault Portal) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following <br /> equipment, if installed: 1)monitoring system control panels; 2)in-tank liquid level probes(if used for leak detection); 3) devices <br /> monitoring tank annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent <br /> piping; 7) devices monitoring vapor recovery piping; 8)devices monitoring vent/transition sumps; 9)devices monitoring under-dispenser <br /> containment; 10)line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> V.R. <br /> ALL SUMPS AND UDC ARE ALL TANKS HAVE 303 <br /> DOLE)BLE WALL SUMPS W/ ANNULARSENSDRS <br /> 208 SUMP SENSORS AND 304 <br /> INTERSTIAL SPACE SENSORS. <br /> BUILDING 0 <br /> VENTSUMP <br /> Lewd <br /> �.-- submesol:-u.e,n.rt,rn (f/ ,a,eon..mo L, .,xp..nscr <br /> DIESELI DIESEL 2 BIO DIESEL <br /> BIO DIESEL BLEND/PIPING <br /> SUMP <br /> 0 STP STp O <br /> �� gS / <br /> 0.L P <br /> 8N5 <br /> IITI') ITIy) O <br /> 4 35l1T 3 25117 2I (LSAT <br /> SAT uC�'In <br /> LLJJ W O <br /> ESO o a LL <br /> E 1 <br /> 0 0 0 <br /> rn m c <br /> 9 <br /> 0 0 _ m <br /> O 5 <br /> DEF <br />