Laserfiche WebLink
RECEIVED BY EHD: <br /> UNDERGROUND STORAGE TANK 7/27/2021 <br /> MONITORING SYSTEM CERTIFICATION FORM (Page (received via Crompco Vault Portal) <br /> XVI. LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? <br /> (Check all that apply.) Simulated leak rate verified: 3 GPH 1.1 GPH 0.2 GPH <br /> Was the testing apparatus properly calibrated? Wo F <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? F- F- rv- <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? F- F- rv- <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? F,1 F- F- <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? F7 F <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? F7 F <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? r7o F- I! <br /> Were all items on the equipment manufacturer's maintenance checklist completed? T7 17- F- <br /> Were all LLDs confirmed operational within regulatory requirements? W 17- F- <br /> or any answer of'W"above, describe in section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) Vacuum Pressure Hydrostatic <br /> Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S1 DSL PROD. LINE Fv-0 Pass F-Fail Wo Pass f-Fail <br /> S2 DSL 2PROD. LINE W Pass F Fail W Pass F-Fail <br /> S3 VENT LINE Fv-Pass F Fail W Pass F-Fail <br /> F-Pass I!Fail F-Pass F-Fail <br /> Pass Fail F-Pass F-Fail <br /> Pass Fail F-Pass F-Fail <br /> r-Pass Fail F-Pass F-Fail <br /> F-Pass I!Fail F-Pass F-Fail <br /> F-Pass I!Fail F-Pass F-Fail <br /> Pass Fail F-Pass F-Fail <br /> Pass Fail F-Pass F-Fail <br /> r-Pass r-Fail F-Pass F-Fail <br /> Simulated leak at far ends of the interstitial space. Visual Inspection <br /> How was interstitial communication verified? - Other(Describe the method in section XV below.) Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? Fv-O Yes F- No (Describe the reason in section XV below.) <br /> For any answer of'W"above, describe in section Xlll how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons per hour, Y=Yes, N = No, NA = Not applicable, VPH =Vacuum/Pressure/Hydrostatic, ID = Identification <br />