Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> SPILL CONTAINER TESTING REPORT FORM(Page 1 of 1) <br /> Type of Action r Installation Test r Repair Test r 12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test: <br /> CERS 10689070 7/10/2020 <br /> Business Name(Same as Facility Name or DBA-Doing Business As.) <br /> Fed Ex Ground <br /> Business Site Address City: Zip: <br /> 120 S Hansen Road Tracy 95304 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification.) Phone# <br /> Jesus Saldivar (800)800-4633 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Class A General Engineering 743160 8361393 6/13/2021 <br /> Spill Container Testing Training and Certifications (List applicable certifications_) <br /> ICC-CA UST Service Technician 8361393 06/13/2021 RECEIVED BY EHD: <br /> III. SPILL CONTAINER TESTING INFORMATION 7/27/202 <br /> Test Method Used: r Manufacturer Guidelines: (Specify) (received via Crompco Vault Portal) <br /> W Industry Code or Engineering Standard: (Specify) PEI RP 1200 <br /> F Engineered Method: (Specify) <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Tank ID: (By tank number, stored product, etc.) Fill T-1 Fill T-2 Fill T-3 <br /> Diesel Diesel Biodiesel <br /> Spill Container Manufacturer: OPW OPW OPW <br /> W Non-Metallic P Non-Metallic P Non-Metallic F Non-Metallic <br /> Method of Cathodic Protection F Isolation F Isolation F Isolation F Isolation <br /> F Other F Other F Other F Other <br /> (Specify in section V) (Specify in section V) (Specify in section V) (Specify in section V) <br /> Inside Diameter of Spill Container: (Inches) 12 12 12 <br /> Depth of Spill Container: (Inches) 14 14 14 <br /> Does the spill container have a 5 gallon capacity? F7Yes F No F7 Yes F No F7 Yes F No F Yes F No <br /> W Drain Valve F Drain Valve F Drain Valve F Drain Valve <br /> Method to Keep Spill Container Empty F Onsite Pump F Onsite Pump F Onsite Pump F Onsite Pump <br /> F Other F Other F Other F Other <br /> (Specify in section V) (Specify in section V) (Specify in section V) (Specify in section V) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results WO Pass r— Fail I P Pass r—Fail WoPass f— Fail Pass f— Fail <br /> V. COMMENTS <br /> All items marked failed above must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations,title 23,division 3,chapter 16,section <br /> 2637.1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> 'A,eL— <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground storage tank,ICC=International Code Council <br />