My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:54:03 AM
Creation date
6/29/2021 9:05:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Inc. Policy loo-29-A O <br /> 11000 N.MoPac Expressway.Suite 500 Austin,TX 76759 (800)964-0010 <br /> JOB CLEARANCE FORM&SITE SAFETY CHECKLIST-OVF ae°`Q <br /> Revised:v1 v2o19 z <br /> Site Name/#: Ireot A dress:(7,1 <br /> ✓G.C. oN IV <br /> Arrival ime' epa ure Time: Tra e' I e no: ate (.J.) <br /> Scope of Work and Tasks Performed(JSA's must ob available for all tasks): gs n %Q <br /> Repairs to Equipment or Pans Provided: Ib <br /> Follow-up actions required;equipment isolatetl;comments: ,t.o�ew.oe.t s, c r..d aM,w�—o r3,uW Prod wkd T7;pt1�✓���uWed• <br /> n kus�� cr, �� — �r Rad � 5 * ��E w <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check✓items used or mark-if nota applicable) <br /> Safety Vest �t Safety Glasses ,iu Gloves ❑ Hearing Protection <br /> Steel Toe Boots [ Splash Goggles ❑ Hard Hat ❑ Other <br /> ✓ <br /> PRE-TEST PROCEDURES (Check ,'each item completed or mark - if not applicable) <br /> 1. Discuss safety procedures with site personnel. Nearest hospital: i <br /> 2. Prior to fuel delivenes the UST system must be placed back into working order. <br /> 3. ySecure entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. Confined Space Entry-If required complete separate CSE Checklist. If NO CSE REQUIRED check the following reason: <br /> ❑No CS's ❑CS's not opened 4o entry only visual )(No entry-used tools []Work from prone position w/o risk of falling in <br /> 6. ❑ Implement Lockout/Tagout per API 1646(when accessing product piping during tasks) <br /> ❑ Secure nozzles with"Out of Service'bags and nylon ties. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"conned r from the STP(s). <br /> O ❑ All applicable equipment disabled during testis). ❑ Verify LOTO is complete by tryin o perate mps. <br /> G SIGN IN Lead Technician Name ad Tecnm nsi,nawre <br /> ~' General Safety Checks: , `, <br /> All site personnel have been informed. \,/U V <br /> Is a fuel delivery due today? ') �, site Representative Name a Repr a ive Si azure <br /> LOTO procedures have been discussed. �,.�P`/),. .�,ACS <br /> Work areas barricaded to protect workers,staff&public. "P�C!'I <br /> ✓ POST-TEST PROCEDURES(Check 'each item completed or mark - if not applicable) <br /> 1. Remove all"Lockout/Tagout"devices and nozzle bags/ties. <br /> 2. Run all pumps and verify there are no leaks: Impact Valve Test Ports under dispensers <br /> Leak Detector Threads on STP's Functional Elements&Relief Screws <br /> 3. Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: 1_1_ L2 L3 L4 1_5 1_6 <br /> 4. d( Check following components operational: .E ATG probes,sensors,&caps <br /> v Ball floats,dry breaks&caps Cathodic protection operational <br /> n m $Containment sumps are dry Y Dispensers&POS operational <br /> rD N n r Dispenser panels are replaced Drop tubes,flapper valves,fill adapters&caps <br /> < v m e Leak detectors&vent tubes Manhole covers and sump lids <br /> (D 1�1 yMonitoring system is operational or Shear valves are open <br /> < N CSiphon lines and manifold valves open Y Spill containers&drain valves <br /> sv Q m STP fittings and bayonet connectors Vents&Extractors(not capped, g d ori fated) <br /> N 5. Remove barricades. <br /> r v SIGN OUT&Operator Verification of Work(OVF Lead Technician Name Lead a ici ignaure <br /> O W General Safety Checks: cc''I IG Iv✓XV- <br /> Work area has been left clean&safe. •so l <br /> -6 Site staff aware of work status Including any remaining isolation. Site Representative Namg s Represe aura <br /> n Changes to equipment are documented and communicated. �� <br /> O Tm All incidents,near Incidents,and unsafe situations reported. ic".11l3/'L� <br /> 2 Sita Representative Comments: to <br /> Is Is c <br /> COMPANY CONFIDENTIAL. U Tanknology Inc.,2019.All Rights Reserved. (, <br /> O 'nted copies of this documcnl:ua n molted.The current version is available in the Tanknology On-Line Document Control System <br /> r 0 <br /> � O <br /> ''0 <br /> III <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.