My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014253
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUNCAN
>
3995
>
2600 - Land Use Program
>
PA-2100128
>
SU0014253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 2:38:57 PM
Creation date
6/29/2021 11:45:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014253
PE
2690
FACILITY_NAME
PA-2100128
STREET_NUMBER
3995
Direction
N
STREET_NAME
DUNCAN
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
10509008, -09
ENTERED_DATE
6/22/2021 12:00:00 AM
SITE_LOCATION
3995 N DUNCAN RD
RECEIVED_DATE
6/25/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br />Electric Company <br />J U ly 16, 2021 <br />Guiseppe Sanfilippo <br />Planner <br />San Joaquin County <br />Ref: Gas and Electric Transmission and Distribution <br />Dear Guiseppe, <br />Plan Review Team <br />Land Management <br />PGEPIanReview@pge.com <br />2730 Gateway Oaks <br />Sacramento, CA 95833 <br />Thank you for submitting the PA -2100128 (LA) plans for our review. PG&E will review the <br />submitted plans in relationship to any existing Gas and Electric facilities within the project area. <br />If the proposed project is adjacent/or within PG&E owned property and/or easements, we will be <br />working with you to ensure compatible uses and activities near our facilities. <br />Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) <br />and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br />your safety and to protect PG&E's facilities and its existing rights. <br />Below is additional information for your review: <br />1. This plan review process does not replace the application process for PG&E gas or <br />electric service your project may require. For these requests, please continue to work <br />with PG&E Service Planning: https://www.pge.com/en US/business/services/building- <br />and-renovation/overview/overview. page. <br />2. If the project being submitted is part of a larger project, please include the entire scope <br />of your project, and not just a portion of it. PG&E's faces are to be incorporated within <br />any CEQA document. PG&E needs to verify that the CEQA document will identify any <br />required future PG&E services. <br />3. An engineering deposit may be required to review plans for a project depending on the <br />sizeI scope, and location of the project and as it relates to any rearrangement or new <br />installation of PG&E facilities. <br />Any proposed uses within tf'le PG&E fee strip and/or easement, may include a California Public <br />Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a <br />conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will advise if the <br />necessity to incorporate a CPUC Section 851filing is required. <br />This letter does not constitute PG&E's consent to use any portion of its easement for any <br />purpose not previously conveyed. PG&E will provide a project specific response as required. <br />Sincerely, <br />Plan Review Team <br />Land Management <br />PG&E Gas and Electric Facilities Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.