My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:25:59 PM
Creation date
7/2/2021 3:42:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231819
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0003732
FACILITY_NAME
GAVINKO PETROLEUM*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
7700 MORELAND ST STOCKTON 95212
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Bucket <br />Report Form <br />SWRCB, January 2006 <br />This form is intended for use by contractors petforming annual testing of UST spill containment structures. The completed for to and <br />printouts front tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatmy agency. <br />1. <br />FACILITY INFORMATION <br />Name: Confidence , <br />Technician Conducting Test:Bry <br />an A Self <br />Credentials': Z CSLB Contractor 5 ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other <br />License Number(s): 804904 <br />8022804 <br />3. SPILL BUCKET TESTING INFORMATION <br />Comments — (include information on repairs, made prior to <br />Test Method Used: V/ Hydrostatic El Vacuum 0 Other <br />Test Equipment Used: Lake Test Equipment Resolution 0.0625' <br />Identify Spill Bucket (By Tank 1 2 3 4 <br />Super 9l <br />Number, Stored Product, etc. <br />❑ Direct Bury ❑ Direct Bury ❑ Direct Bury [I Direct Bury <br />Bucket Installation Type: <br />0 Contained in Sum El Container] in Sum [I Contained in Sum FJ Contained in Sum <br />Bucket Diameter: <br />12.00" <br />Bucket Depth: <br />14.00" <br />Wait time between applying <br />5 Min <br />vacuum/water and start of test: <br />Test Start Time (T►): <br />1:00 pm <br />Initial Reading (111): <br />12.25" <br />Test End Time (TF): <br />2:00 pm <br />Final Reading (RF): <br />12.25 <br />Test Duration (TF — Ti): <br />1 Hour <br />Change in Reading (RF - R►): <br />0.00" <br />Pass/Fail Threshold or <br />0.0625" <br />Criteria: <br />Test Results41: <br />© Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />testing and recommended follow-up,(ot• faired tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE <br />I hereby certify that all the <br />Technician's Signature:, <br />State laws and regulations do not <br />may be more stringent. <br />contained in this <br />testing to <br />CONDUCTING THIS TESTING <br />and in full compliance with legal requiretnettts. <br />Date: 09/06/2018 <br />by a qualified contractor. However, local requirements <br />UST ServicesInc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.