My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:25:59 PM
Creation date
7/2/2021 3:42:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231819
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0003732
FACILITY_NAME
GAVINKO PETROLEUM*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
7700 MORELAND ST STOCKTON 95212
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br />UST Monitoring Site Plan <br />SEP 1 1 2018 <br />ENVIRONMENTAL <br />Site Address: 99 SHELL 7700 MORELAND ROAD STOCKTON CA 95212 LICA I TI -1 r,PpARTMEN IT <br />*PIPING * <br />(ARROWS) <br />Drawing of piping <br />exit of sump and <br />UDC's. No <br />underground <br />drawing is accurate, <br />we cannot <br />speculate blue <br />prints. <br />B T <br />OA x <br />s <br />P , <br />YYL <br />P <br />. 87. <br />Any items underground that are not visible to the certifying technician area <br />professlorra/opinion only and are solely for it formational proposes. Drawing <br />rrot <br />8. <br />. <br />........ <br />KEY <br />A <br />= ANNULAR <br />F = <br />FILLS <br />T = <br />TURBINE <br />P = <br />PROBE <br />V <br />= VAPOR <br />X <br />= SUMP SENSOR <br />. . . . . . . . . . <br />L <br />= Leak Detector <br />. . . . . . . . . . . . . . . . . . . . . . . . <br />M <br />= Manway <br />B <br />= Brine Sensor <br />ESEL. . . . . . . . . . <br />I =Smart <br />Sensor <br />. . . . . . . <br />S=STP <br />' ' ' ' ' ' ' . ' . <br />C <br />= Floats & Chains <br />. . . . . . . . . . <br />E <br />= E Stop <br />to scale <br />Date map w -as drawn <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.