Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />SEP 1 1 2018 <br />ENVIRONMENTAL <br />Site Address: 99 SHELL 7700 MORELAND ROAD STOCKTON CA 95212 LICA I TI -1 r,PpARTMEN IT <br />*PIPING * <br />(ARROWS) <br />Drawing of piping <br />exit of sump and <br />UDC's. No <br />underground <br />drawing is accurate, <br />we cannot <br />speculate blue <br />prints. <br />B T <br />OA x <br />s <br />P , <br />YYL <br />P <br />. 87. <br />Any items underground that are not visible to the certifying technician area <br />professlorra/opinion only and are solely for it formational proposes. Drawing <br />rrot <br />8. <br />. <br />........ <br />KEY <br />A <br />= ANNULAR <br />F = <br />FILLS <br />T = <br />TURBINE <br />P = <br />PROBE <br />V <br />= VAPOR <br />X <br />= SUMP SENSOR <br />. . . . . . . . . . <br />L <br />= Leak Detector <br />. . . . . . . . . . . . . . . . . . . . . . . . <br />M <br />= Manway <br />B <br />= Brine Sensor <br />ESEL. . . . . . . . . . <br />I =Smart <br />Sensor <br />. . . . . . . <br />S=STP <br />' ' ' ' ' ' ' . ' . <br />C <br />= Floats & Chains <br />. . . . . . . . . . <br />E <br />= E Stop <br />to scale <br />Date map w -as drawn <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />