Laserfiche WebLink
UNDERGROUND STORAGETANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under -dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />Monitoring System Certiftrtation <br />UST Monitoring Site Plan <br />Address: CALIFORNIA CAR WASH —ZOOM 3434 E. HAMMER LAND STOCKTON CA 95212 i <br />KEY <br />A = ANN'T1LAR <br />F = FILLS <br />T = TURBINE <br />P = PROBE <br />V = VAPOR <br />X = SLT_NIP SENSOR <br />L = Leak Detectora• <br />AI = Afanwa <br />B =Brine Sensor <br />I = Swart Sensor <br />S=STP <br />C =Floats & Chains <br />E=E Stop <br />_ .OVERFILL,,, <br />. _ . E -STOP <br />OIL <br />MANGE .4. • <br />C - • • • . <br />SHOP <br />P <br />PIPING } <br />(ARROWS) <br />Drawing of pipi <br />Drng <br />exit of sump and <br />UDC's. No <br />nu <br />alereround <br />dracau.,a is <br />accurate, ave <br />cnnnotspeculate <br />blue prints. <br />�I <br />KEY <br />A=APL�'ULAR <br />F=FILLS <br />T = T17FBLNE <br />P=PROBE <br />Z' <br />=VAPOR <br />X= SUMP SENSOR <br />L =Leak Detector,� <br />I11=Afanwa <br />B =Brine Sensor <br />I = Smart Sensor <br />S = STP <br />C=Floats & Chains <br />E =E Stop <br />................. <br />_ .OVERFILL,,, <br />. _ . E -STOP <br />OIL <br />MANGE .4. • <br />C - • • • . <br />SHOP <br />P <br />PIPING } <br />(ARROWS) <br />Drawing of pipi <br />Drng <br />exit of sump and <br />UDC's. No <br />nu <br />alereround <br />dracau.,a is <br />accurate, ave <br />cnnnotspeculate <br />blue prints. <br />�I <br />KEY <br />A=APL�'ULAR <br />F=FILLS <br />T = T17FBLNE <br />P=PROBE <br />Z' <br />=VAPOR <br />X= SUMP SENSOR <br />L =Leak Detector,� <br />I11=Afanwa <br />B =Brine Sensor <br />I = Smart Sensor <br />S = STP <br />C=Floats & Chains <br />E =E Stop <br />T <br />G <br />C <br />A <br />R <br />.4rW itemr undergroundthat are not visible 10 rhe cw•tj�iirsg tscloticimt are a <br />prgfessionIIlopinionort�,i+mrdm�ssols{t•fornljormmiortalp:oposav IJrmring <br />nor Lo scale <br />Date map was drawn: 1 112 012 0 1 %. <br />Instructions <br />if you already have a diagram that shows all required information. you rmay ineludz if, rather than this page, with your Monitoring System Certification. On your ede plan, <br />shout the g=_neral layout of tanks and piping. Clearly identify bcatfans of the following equipment, 'drnstalled: monitoring system wntrol panels; sensors ntonitorina tank <br />annular spaces, sumps, dispenser pans, spill wntainers, or other se:•andary containment areas: mechanical or electronro line leak detectors; and in -tank liquid level <br />probes (if used for [oak detection). Irt the space provided, natz the dot=_ this Site Plan was prepared. <br />. <br />. . <br />. <br />. <br />. <br />. <br />. <br />. <br />. . <br />. <br />. <br />. <br />. . <br />. <br />. <br />T <br />G <br />C <br />A <br />R <br />.4rW itemr undergroundthat are not visible 10 rhe cw•tj�iirsg tscloticimt are a <br />prgfessionIIlopinionort�,i+mrdm�ssols{t•fornljormmiortalp:oposav IJrmring <br />nor Lo scale <br />Date map was drawn: 1 112 012 0 1 %. <br />Instructions <br />if you already have a diagram that shows all required information. you rmay ineludz if, rather than this page, with your Monitoring System Certification. On your ede plan, <br />shout the g=_neral layout of tanks and piping. Clearly identify bcatfans of the following equipment, 'drnstalled: monitoring system wntrol panels; sensors ntonitorina tank <br />annular spaces, sumps, dispenser pans, spill wntainers, or other se:•andary containment areas: mechanical or electronro line leak detectors; and in -tank liquid level <br />probes (if used for [oak detection). Irt the space provided, natz the dot=_ this Site Plan was prepared. <br />