My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 1:17:38 PM
Creation date
7/6/2021 12:58:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of TestinglServicing <br />Software version Installed: _123.02 <br />Complete the following checklist: <br />In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Monitoring System Certification <br />12/07 <br />2 2/21/07 <br />x <br />Yes <br />❑ <br />No <br />is the audible alarm operational? <br />x <br />Yes <br />❑ <br />No* <br />Is the visual alarm operational? <br />x <br />Yes <br />❑ <br />No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />x <br />Yes <br />❑ <br />No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />proper operation? <br />not interfere with their <br />❑ <br />Yes <br />❑ <br />x <br />No* <br />N/A <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />x <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shutdown? (Check all that apply) <br />❑ Sumpfrrench Sensors; ❑ Dispenser Containment Sensors. Did you confirm positive shutdown due to leaks and sensor <br />failure/disconnection? ❑ Yes; ❑ No. <br />❑ <br />Yes <br />❑ <br />x <br />No* <br />N/A <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (Le, no mechanical overfill prevention <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capacity does the alarm trigger? % <br />❑ <br />Yes* <br />x <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />manufacturer name and model for all replacement parts in Section E, below. <br />replaced and list the <br />❑ <br />Yes* <br />x <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />es, describe causes in Section E, below. <br />Product; ❑ Water. If <br />x <br />Yes <br />❑ <br />No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />x <br />Yes <br />❑ <br />No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Monitoring System Certification <br />12/07 <br />2 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.