Laserfiche WebLink
GEOTECHNICAL EXPLORATION SITE PLAN <br />BORINGS B-01 AND B-02 <br />LATH ROP WYE AND TRACK EXTENSION <br />MANTECA, CALIFORNIA <br />Date <br />APR 2021 <br />Figure <br />2 <br />ACCESS ROUTE <br />TO BORING B-02 FROM <br />W. LOUISE AVENUE TO <br />THE SOUTH <br />ACCESS ROUTE <br />TO BORING B-01 FROM <br />W. LOUISE AVENUE TO <br />THE SOUTH <br />0 150 150 300 <br />BORING B-02 LOCATION <br />LATITUDE: 37.8183 <br />LONGITUDE:-121 .2620 <br />WITHIN SSJID PROPERTY <br />APN 19811007) =ft 1.111 <br />11 I tit <br />It [III <br />1111 <br />1 <br />1 1 <br />It 11 <br />=:1 <br />MEDLINE DISTRIBUTION CENTER <br />2325W. LOUISE AVENUE <br />MANTECA, CA <br />BORING B-01 LOCATION <br />LATITUDE: 37.8172 <br />LONGITUDE:-121.2622 <br />WITHIN UNION PACIFIC (UP) <br />PROPERTY (APN 19801004) <br />LATHROP, CA <br />APPROXIMATE LOCATION OF PROPOSED <br />EXPLORATORY BORING <br />PROPERTY LINE <br />SSJID = SOUTH SAN JOAQUIN IRRIGATION DISTICT <br />UPRR = UNION PACIFIC RAILROAD <br />LEGEND: <br />B-01 <br />SCALE: 1 INCH = 150 FEET <br />FR <br />C:\pwworking\west01\d2023150\2021-04-02_SSJID and San Joaquin App Maps.dwg, 4 /15/2021 2:34:50 PM, DWG To PDF_NoLayerlr