My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
221
>
2900 - Site Mitigation Program
>
PR0516247
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 3:45:06 PM
Creation date
7/14/2021 9:12:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516247
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0012531
FACILITY_NAME
CITY OF LODI-CENTRAL PLUME
STREET_NUMBER
221
Direction
W
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95241
APN
04303111
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
221 W PINE ST LODI 95241
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NO.: 41-0320-03 DATE DRILLED: 1/27/03 NORTHING: 2231070.3 <br /> LOCATION: Lodi South Area LOGGED BY: J. Hunter EASTING: 6339195.8 <br /> Lodi, California APPROVED BY: D. Padgett, RG TOP OF CASING ELEVATION: 46,54 <br /> DRILLING CO.: Gregg Drilling LID ELEVATION(FLUSH WITH GROUND SURFACE): 47.13 <br /> DRILLING METHOD: 10-inch Hollow-Stem Auger <br /> SAMPLER TYPE: 2-inch Split Spoon WELL <br /> UU TOTAL DEPTH: 77.00 feet } <br /> D_cn w w o o CONSTRUCTION <br /> o U 'o F ) DEPTH TO WATER: 59.50 feet �, o DETAIL <br /> oz U d� U 2 <br /> a m W V) o DESCRIPTION <br /> 40 SILTY CLAY(CL)(continued). 40 <br /> Neat <br /> Cement <br /> a <br /> 45 45 <br /> e <br /> e <br /> CL 4-inch <br /> Schedule <br /> 50 SA5-50 50 40 PVC <br /> e <br /> Bentonite <br /> 55 55 <br /> SAND(SP): Gray(10YR 5/1), 100%fine sand, medium dense, <br /> damp to moist. 4-inch <br /> 0 60 SA5-60 60 Schedule <br /> _-_- 40 PVC <br /> == 0.010 SIo4 <br /> SIP .=== <br /> Filter Pack: <br /> 65 65 No.2/16 <br /> — Sand <br /> — A <br /> 70 SA5-70 � 70 - <br /> CLAYEY SAND(SM): Dark yellowish brown(10YR 4/4), 30% <br /> clay, 70%fine to coarse sand,dense,wet. <br /> SM <br /> 75 75 <br /> End Cap <br /> A I <br /> 80 80 <br /> TMC MONITORING WELL INSTALLATION LOG SA-5 <br /> PAGE 2 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.