Laserfiche WebLink
PROJECT: LODI-CENTRAL PLUME <br /> Lodi,California Log of Monitoring Well MW-26D <br /> PAGE 1 OF 10 <br /> Boring location: See Site Plan, Figure 2 Logged by: M. Holt <br /> Date started: 1/19/05 Date finished: 1/27/05 <br /> Drilling method: Mud rotary <br /> Hammer weight/drop: --- Hammer type: --- <br /> Sampler: Split Spoon <br /> _ SAMPLES E WELL COMPLETION <br /> � a) a g MATERIAL DESCRIPTION INFORMATION <br /> uJ v Sample E o o 'o > Flush mounted <br /> 0 Number co m O J completion <br /> Blank From 0 To 182.5 <br /> 1 Feet <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 0 <br /> 21 <br /> 0 <br /> 22 <br /> 23 <br /> 24 <br /> Lu <br /> 25 <br /> N 26 <br /> M <br /> > 27 <br /> Lu <br /> 28 <br /> Q 29 <br /> z <br /> z <br /> 2 30 <br /> Z <br /> z <br /> TrIM&N E Rollo <br /> Lu Project No.: Figure: <br /> w 3923.14 2a <br />