Laserfiche WebLink
Table 1 Corrective Action Cost Estimate. <br />BASIS <br />Corrective Action Period 30 years <br />Costs estimated in 2008 dollars <br />OPERATION AND MAINTENANCE <br />Item Quantity Unit Price Annual Cost <br />Replacement of non-mechanical items 10% $221,000 $22,100 <br />Staff hours (average) 156 hrs $ 80.00 $12,480 <br />Total Annual Cost $34,580 <br />IAnnual O&M Cost During Corrective Action Period $1,037,400 <br />TOTAL COST OVER CORRECTIVE ACTION PERIOD $1,520,265 <br />ANNUAL COST $50,676 <br />Note: inflation factor supplied by CIWMB <br />Corrective Action Financial Assurance Cost Estimate 6 <br />North County Recycling Center and Sanitary Landfill <br />September 30, 2008 <br />Public Works/Solid Waste Div. <br />CONSTRUCTION <br />Item <br />Quantity Unit Price <br />Extended Cost <br />LFG System Enhancement <br />Contractor Mobilization <br />$15,000 <br />Vertical LFG Wells (9 @ 120 ft ea) <br />1080 LF $140 <br />$151,200 <br />Lateral pipe on surface (9 @ 120 ft ea) <br />1080 LF $48.00 <br />$51,840 <br />Well head and connection <br />9 each $2,000 <br />$18,000 <br />LFG Extraction System Subtotal <br />$221,040 <br />Permits and Inspections <br />RWQCB <br />LS <br />$4,000 <br />Well Drilling Permit Fees <br />LS <br />$550 <br />Inspection Fees <br />15 hr $105 <br />$1,575 <br />Permits and Inspections Subtotal <br />$6,125 <br />EMP Work Plan and Implementation <br />Professional and Technical Services <br />LS <br />$65,700 <br />Driller, Lab, Surveyor, Utility Clearance <br />LS <br />$133,500 <br />EMP Work Plan and Implementation Subtotal <br />$199,200 <br />Engineering Design <br />Professional and Technical Services <br />LS <br />$51,400 <br />Final Report <br />LS <br />$5,100 <br />Engineering Design Subtotal <br />$56,500 <br />Total Construction Cost <br />$482,865 <br />OPERATION AND MAINTENANCE <br />Item Quantity Unit Price Annual Cost <br />Replacement of non-mechanical items 10% $221,000 $22,100 <br />Staff hours (average) 156 hrs $ 80.00 $12,480 <br />Total Annual Cost $34,580 <br />IAnnual O&M Cost During Corrective Action Period $1,037,400 <br />TOTAL COST OVER CORRECTIVE ACTION PERIOD $1,520,265 <br />ANNUAL COST $50,676 <br />Note: inflation factor supplied by CIWMB <br />Corrective Action Financial Assurance Cost Estimate 6 <br />North County Recycling Center and Sanitary Landfill <br />September 30, 2008 <br />Public Works/Solid Waste Div. <br />