My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
1831
>
PR0440058
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:12:56 PM
Creation date
7/16/2021 12:52:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. COST ANALYAS <br />The cost of the corrective action plan includes engineering design, construction and <br />associated materials, permitting, and the final report for implementing the corrective <br />action. A detailed break down of the associated cost for the project is shown in Table 1. <br />Permitting associated with the project will include RWQCB and SJC well drilling <br />permits. The total project cost was estimated at approximately $156,000. <br />Table 1 Corrective Action Cost Estimate. <br />3 -Inch HDPE Pipe <br />1400 <br />LF <br />$6.25 <br />8,750 <br />3 -Inch HDPE Header Valve <br />3 <br />each <br />$525.00 <br />1,575 <br />Vertical LFG Well <br />720 <br />LF <br />$130.00 <br />93,600 <br />LFG Wellhead <br />9 <br />each <br />$723.25 <br />6,509 <br />Connection to Wellheads <br />9 <br />each <br />$2,000.00 <br />18,000 <br />Connection to Existing Header <br />3 <br />each <br />$2,000.00 <br />6,000 <br />Connection to LCRS <br />1 <br />each <br />$1,000.00 <br />1,000 <br />Geoprobe Investigation <br />6 <br />each <br />$700.00 <br />4,200 <br />Total Cost of LFG Extraction System <br />135,434 <br />4,000 <br />RWQCB^ <br />Well Drilling Permit Fee <br />550 <br />Inspections <br />500 <br />Total Cost of Permitsllnspections <br />5,050 <br />10,000 <br />Professional and Technical Services <br />Final Report <br />5,000 <br />Total Cost of Engineering Design 15,000 <br />Total Project Cost <br />Kleinfelder offers various levels of investigative and engineering services to suit the <br />varying needs of our clients. Although risk can never be eliminated, more detailed and <br />extensive investigations yield more information, which may help understand and manage <br />the level of risk. Since detailed investigation and analysis involves greater expense our <br />clients participate in determining levels of service, which provide adequate information <br />for their purposes at acceptable levels of risk. <br />Regulations and professional standards applicable to Kleinfelder's services are <br />continually evolving. Techniques are, by necessity, often new and relatively untried. <br />Different professionals may reasonably adopt different approaches to similar problems. <br />73467 5 August 9, 2006 <br />LA 63107 Corrective Action Financial Assurance Cost Estimate <br />NCRC and Sanitary Landfill <br />
The URL can be used to link to this page
Your browser does not support the video tag.