Laserfiche WebLink
Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> 01.DESIGN(describe): Increse in vertical height from 190 ft to 320 ft NAVD <br /> MR 2. (describe): Increase In(peak)dally tonnage limit from 825 to 1200 tons per day <br /> Inc ase in pea daily incoming refuse vehicles from 50U to 55U per day <br /> X 3. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): <br /> North County Recuciing Center and Sanitary Landfill,17720 East Harney Lane,Lodi,CA 94240 <br /> W4. (describe): Use of heavy equipmeent to dispose and cover received refuse from 6:30 AM to TOOPM,see below. <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS 1200 TPD(proposed permit limit) <br /> 1) DISPOSAL/TRANSER(unit) 1200 TPD(proposed permit limit) <br /> 2) OTHER(unit) <br /> b. DAILY DESIGN TONNAGE(TPD) In excess of 1200 TPD <br /> c. FACILITY SIZE(acres) 320(no proposed change) <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd) 600 Incoming carrying refuse,20 outgoing removing material (curent permit limit),approx 50 staff <br /> e. DAYS AND HOURS OF OPERATION Operates 365 days per year except on posted holidays. Refuse receipt hours from 7:00 AM to 5:00 PM(no <br /> change).Use of heavy equipment out-of-doors to process refuse from 6:30 AM to 7:00 PM. Other activity per San <br /> Joagui�n Count/Noise Ordinance,ancillary uses as needed. <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOS I IAli FACILITIES <br /> a. SITE STORAGE CAPACITY(cu yds) NA <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY <br /> a. AVERAGE DAILY TONNAGE(TPD) 433 TPD(2008) <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) 20.9 Million CY refuse diaposal <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds) 41.9 Million CY refuse disposal <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) CMarch <br /> CY refuse dis os Mar 26 2008 to March 1 2009 estimated <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) Y based on proposed height limit of 320 ft msl <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): <br /> g. LAST PHYSICAL SITE SURVEY(Date) March 26,2008 <br /> h. ESTIMATED CLOSURE DATE(month and year) December 2048(Final EIR,Appendix F,height to 230 ft MSL) <br /> i. DISPOSAL FOOTPRINT(acres) 185 acres(no proposed change) <br /> j. SITE CAPACITY PLANNED(cu yds) 41.9 million CY <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste) NA,see k2.below <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v) NA,see k2.below <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) 0.5 (varies) <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> ❑A. MUNICIPAL OR UTILITY SERVICE: <br /> ®B.INDIVIDUAL(Welis): Three wells located on property,one in use for landfill operations. <br /> ®C.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC.: On-site interim sedementation pond(intermittent use) <br /> 2.TYPE OF WATER RIGHTS: <br /> [—]RIPARIAN APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE: <br /> Page 2 <br />