My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:12:56 PM
Creation date
7/16/2021 12:52:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of <br /> Natalia Subbotnikova [EH] <br /> From: Snider, Patrick[psnider@CIWMB.ca.gov] <br /> Sent: Wednesday, May 06, 2009 11:22 AM <br /> To: Natalia Subbotnikova[EH] <br /> Cc: Robert McClellon [EH] <br /> Subject: RE: Questions about the proposed North County permit <br /> Natalia, <br /> In the Statement of Overriding Considerations Section A, top of page 2, the sentence, The additional <br /> capacity would also extend the operational life of the existing landfill from 2032 to approximately <br /> 2046... <br /> The footnote on the Findings of Significant Environmental Impacts, (the page right after the Statement <br /> of Overriding Consideration) in the EIR states, The projected year of 2046 to reach capacity is based <br /> on the revised requested height maximum of 320 vertical feet above MSL. The original requested <br /> height of 420 feet above MSL would have extended the time-to-capacity until 2048. <br /> Table 2 in the JTD shows the closure date to be 2048 with a requested maximum height of 320 vertical <br /> feet above MSL. We need the projected closure date to match in both of the documents (Table 2 of the <br /> JTD and the Statement of Overriding Considerations). The estimated closure date found on table two, <br /> according to the Statement of Overriding Considerations should be 2046, not 2048, as indicated. <br /> Thanks, <br /> Patrick Snider <br /> IWIVIS <br /> From: Natalia Subbotnikova [EH] [mailto:nsubbotnikova@sjcehd.com] <br /> Sent: Wednesday, May 06, 2009 9:19 AM <br /> To: Snider, Patrick <br /> Subject: RE: Questions about the proposed North County permit <br /> Yes, MSL is 320. <br /> Thanks... Natalia <br /> From: Snider, Patrick [mailto:psnider@CIWMB.ca.gov] <br /> Sent: Wednesday, May 06, 2009 9:15 AM <br /> To: Natalia Subbotnikova [EH] <br /> Subject: RE: Questions about the proposed North County permit <br /> Natalia, <br /> Thank you. I wanted to make sure that the Statement of Overriding Considerations dated <br /> December 5, 2006, is the newest version of the document and you confirmed that it is the <br /> case. Also on number 2 listed below, the MSL is 320, not 230 correct? <br /> Thanks, <br /> 5/6/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.