Laserfiche WebLink
4 <br />Table 2 <br />Summary of Pertinent Information <br />North County Recycling Center and Sanitary Landfill <br />San Joaquin County, California <br />Item <br />Value <br />Landfill Start of Operations <br />1991 <br />Site Volume' (based on proposed maximum height) <br />43.6 million cy <br />Site Capacity for Refuse Disposa12 <br />41.9 million cy <br />Current In-place Waste (as of 3/08) <br />5.3 million cy <br />Remaining Waste Capacity (as of 3/08) <br />36.6 million cy <br />Projected Closure Year <br />2046 3,4 <br />Maximum Elevation at Closure <br />320 feet above msl <br />Waste Footprint at Closure <br />185 acres <br />Operations: <br />1200 tons <br />Peak Daily Refuse Weight (proposed limit) <br />Peak Daily Refuse Weight (August 22, 2007) <br />810 tons <br />Maximum Incoming Refuse Vehicles (Proposed) <br />850 per day <br />Environmental Impact Reports: <br />Initial Siting <br />March 1989 <br />Permit Revision <br />December 2006 <br />Refuse disposed in 2008 <br />143,164 tons <br />Future refuse escalation rate (assumed) <br />3% per year <br />Estimated waste disposal (5 -year projection) <br />166,000 tons <br />Notes <br />1 Airspace between bottom of excavation and top of final cover, includes LCRS, ops layer and final cover. <br />2 Refuse capacity includes volume of refuse, daily cover and intermediate cover soils; does not include <br />LCRS, operations layer over LCRS, or final cover. <br />3 Per EIR, December 5, 2006, Statement of Overriding Concerns, page 2. <br />4 The projected closure year is re -estimated annually. Calculations for this estimate include the refuse <br />inflow rate of the previous year, an assumed annual rate of increase of refuse disposal, and an assumed <br />refuse density based on previous years' densities. The projected closure date in this table is based on <br />information available in November 2006. Disregard other estimates in the Environmental Impact Report <br />prior to this date. <br />cy = cubic yards <br />msl = Mean Sea Level <br />N:\1North County\Permit Revision 06-09\JTD\NCJTDTables 5-14-09.xls <br />Rev May 14, 2009 <br />North County Recycling Center <br />and Sanitary Landfill <br />Joint Technical Document <br />