Laserfiche WebLink
a <br />Items <br />FINAL COVER INSTALLATION <br />Preliminary Closure Cost Estimate <br />11 <br />Quantity ( Units I Unit Cost I Extn <br />Existing : Vegetative Partial Soil Cover <br />Proposed : Prescriptive Cover (for costing) <br />7 <br />EA <br />$2,500 <br />$17,500 <br />1.0 Preparation for cover placement <br />185 <br />ACRE <br />$3,500 <br />$647,500 <br />2.0 Place GCL Barrier <br />8,461,500 <br />SF <br />$0.60 <br />$5,076,900 <br />3.0 Place Geocomposite Drainage Layer <br />(over 20% of the geomembrane) <br />1,692,300 <br />SF <br />$0.60 <br />$1,015,400 <br />4.0 Place 1 foot Vegetative Soil Cover <br />470,000 <br />CY <br />$4 <br />$1,252,000 <br />5.0 Hydroseeding <br />185 <br />ACRE <br />1 $3,500 <br />$647,500 <br />Final Cover Soil Subtotal <br />1 <br />1 $8,639,300 <br />LEACHATE CONTROL IMPROVEMENTS <br />Existing : All facilities for 7 sumps in place at time of closure <br />7,0 Proposed : Inspect and repair all leachate removal systems <br />7 <br />EA <br />$2,500 <br />$17,500 <br />Leachate Control Improvements Subtotal <br />2 <br />LS <br />$10,500 <br />$17,500 <br />LFG MIGRATION MONITORING AND CONTROL SYSTEM <br />Existing: All facilities are in place at time of closure <br />8.0 Proposed: Replacements during closure <br />3 <br />Each <br />$10,500 <br />$31,500 <br />LFG EMISSION MONITORING AND CONTROL SYSTEM <br />2 <br />LS <br />$10,500 <br />$21,000 <br />Existing � Majority of system in place <br />1 <br />1 $21,000 <br />9.1 Proposed: Disabling and Rebuilding Gas System" <br />1 <br />LS <br />$60,300 <br />$60,300 <br />9.2 Proposed: Well Replacement Costs` <br />1 <br />LS <br />$121,700 <br />$121,700 <br />LFG Emission Control System Subtotal <br />1 <br />1 $213,500 <br />GROUNDWATER MONITORING SYSTEM <br />Groundwater Monitoring installations <br />Existing: All facilities are in place at time of closure <br />10,0 Proposed: Wells replaced during closure <br />2 <br />LS <br />$10,500 <br />$21,000 <br />Groundwater Monitoring System Subtotal <br />1 <br />1 $21,000 <br />See supplemental LFG system cost estimates, Page D-5 <br />PCMP for NCRCSL D-1 Department of Public Works/Solid Waste <br />0: I San Joaquin CountyINCRCSL 11180401PCPMPIFinal ReportiPCPMP D R6, Doc County of San Joaquin - Rev. 02, July 10, 2009 <br />