My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:12:56 PM
Creation date
7/16/2021 12:52:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />E <br />Preliminary Postclosure Maintenance Cost Estimate <br />Items I Quantity I Units I Unit Cost I Annual Cost <br />FINAL COVER MAINTENANCE <br />Soil (replace 6 inches over 1 % of landfill area) <br />1,500 <br />CY <br />$6 <br />$9,000 <br />Seeding and Mulching (approx. 5% of landfill area) <br />10 <br />ACRE <br />$5,500 <br />$55,000 <br />Mowing <br />185 <br />ACRE <br />1 $200 <br />1 $37,000 <br />Cover Repair Subtotal <br />2 <br />EA <br />I <br />1 $1;01,000 <br />LEACHATE MANAGEMENT <br />Leachate Sampling <br />7 <br />EA <br />$320 <br />$2,240 <br />Leachate Analysi's <br />7 <br />EA <br />$200 <br />$1,400 <br />Leachate Collection Systems Sub -total <br />6 <br />EA <br />$320 <br />$3,600 <br />LFG MIGRATION MONITORING AND CONTROL SYSTEM <br />Perimeter Migration Monitoring 18 wells x 3 probes each for <br />quarterly monitoring <br />1 <br />LS <br />$5,200 <br />$5,200 <br />Gas Analysis (includes VOC analysis) <br />1 <br />LS <br />$30,000 <br />$30,000 <br />LFG Migration Control System Subtotal <br />6 <br />EA <br />$320 <br />$35,200 <br />LFG EMISSION MONITORING AND CONTROL SYSTEM <br />Maintenance/ReplacemenUOperation* <br />I <br />LS <br />$318,700 <br />$318,700 <br />LFG Emission Control:Systo.m Subtotal <br />20 <br />EA <br />$600 <br />$318,700 <br />GROUNDWATER, VADOSE AND SURFACE WATER MONITORING" <br />Groundwater Sampling <br />40 <br />EA <br />$320 <br />$12,800 <br />Vadose Sampling (not including VOC analysis from LFG <br />monitoring wells) <br />20 <br />EA <br />$600 <br />$12,000 <br />Surface Water Sampling <br />6 <br />EA <br />$320 <br />$1,920 <br />Storm Water Sampling (NPDES) <br />2 <br />EA <br />$320 <br />$640 <br />Analysis <br />61 <br />EA <br />$200 <br />$12,200 <br />Monitoring Well Maintenance <br />1 <br />ILS <br />$1,000 <br />$1,000 <br />Groundwater and Surface Water Monitoring Subtotal <br />$40,560 <br />DRAINAGE <br />1 <br />LS <br />$7,500 <br />$7,500 <br />SECURITY <br />1 <br />LS <br />$1,000 <br />$1,000 <br />INSPECTIONS AND RECORD KEEPING <br />I <br />LS <br />$8,000 <br />$8,000 <br />See Supplemental Postclosure Costs for LFG Emission Control System, Page EA <br />** See Supplemental Information Regarding Quantities for Estimating Postclosure Maintenance Costs, Page E-5 <br />PCMP for NCRCSL E-1 Department of Public WorkslSolld Waste <br />0ASan Joaquin CountyiNCRCSL17780401PCPMPIFInalRepoTtIPCPMP-D P6 Doc County of San Joaquln -Rev. 02, Ju�v 70, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.