Laserfiche WebLink
Pn Ncz SANJOAQUIN <br />"° ` --COU NTY <br />Greotness grows here. <br />1� <br />wain= far You <br />May 19, 2017 <br />Mr. Todd Del Frate, PG <br />California Regional Water Quality Control Board <br />Central Valley Region <br />11020 Sun Center Drive, Suite 200 <br />Rancho Cordova, California 95670-6114 <br />41 Department of Public Works <br />Kris Balaji, Director of Public Works <br />Fritz Buchman, Deputy DirectorlDevelopment <br />Michael Selling, Deputy DirectorlEngineering <br />Jim Stone, Deputy Director/Operations <br />Najee Zarif, Interim Business Administrator <br />SUBJECT: NEW GROUNDWATER MONITORING WELL INSTALLATION WORK PLAN <br />NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL (NCRCSL) <br />Dear Mr. Del Frate: <br />San Joaquin County is hereby submitting the attached Work Plan for a new downgradient groundwater <br />monitoring well (G-9) at NCRCSL for approval. Well G-9, will act as the point of compliance for lined <br />Modules 5 and 6 according to Title 27 Section 20405 and NCRCSL's Waste Discharge Requirements <br />Order No. R5-2010-0016. <br />Well G-9 will be installed during the construction of Module 5B in June, 2017. The construction <br />specifications of well G-9 are similar to the monitoring wells G-7 and G-8 recently installed at the <br />site. Compliance monitoring of well G-9 will begin after installation. <br />If you have any questions, please contact me at (209) 953-7316. <br />Sincerely, <br />'. fig <br />TAJ M. BAHADORI, PE <br />Senior Civil Engineer <br />TMB:JC:mf <br />N:\Miscellaneous\Groundwater- All Sites\GW Well -NC 2017\2017-05-18 NC -G -9 -Workplan Cover-RWQCB.docx <br />Enclosure <br />c: Jim Stone, Deputy Director/Operations (electronic copy) <br />Desi Reno, Integrated Waste Manager (electronic copy) <br />Robert McClellon, Environmental Health Department (electronic copy) <br />John Moody, RWQCB Permitting (electronic copy) <br />