Laserfiche WebLink
Natalia Subbotnikova [EH] <br />From: Baier, William <bbaier@sjgov.org> <br />Sent: Wednesday, April 4, 2018 7:12 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Garcia, Wilfrido; Chandra, Joyesh; Acevedo, Juan; Bahadori, Taj; Carroll, Michael; Turner, <br />Tim; Baker -Warren, Joan; Thompson, Jack; Chavez, Diego; Constantino, Roy <br />Subject: FW: Module 5B Refuse Placement <br />Good Morning Natalia, please see emails below, once weather permits and 5 B is dry enough to enter safely we will <br />resume filling this module. <br />From: Chandra, Joyesh <br />Sent: Tuesday, April 03, 2018 3:58 PM <br />To: Baier, William <bbaier@sjgov.org>; Garcia, Wilfrido <Wgarcia@sjgov.org> <br />Cc: Bahadori, Taj <tbahadori@sjgov.org>; Reno, Desi <dreno@sjgov.org>; Chavez, Diego <dgchavez@sjgov.org>; <br />Thompson, Jack <jthompson@sjgov.org>; Turner, Tim <tfturner@sjgov.org> <br />Subject: Module 5B Refuse Placement <br />mmm <br />FYI <br />The water board has now allowed placement of refuse in Module 513 at North County Landfill. See email <br />below. <br />JOYESH CHANDRA <br />SAN JOAQUIN COUNTY I PUBLIC WORKS DEPARTMENT I SOLID WASTE DIVISION <br />PH:(209) 468-3066 1 Fax:(209) 468-3078 <br />From: DelFrate, Todd @Waterboa rds <Todd. Del Frate@waterboards.ca.goy> <br />Sent: Tuesday, April 03, 2018 3:40 PM <br />To: Isham, Julian <Julian.lsham@aptim.com>; Bahadori, Taj <tbahadon@s gov.org>; Chandra, Joyesh <br /><Jchandra a s ov.org>; Acevedo, Juan <igacevedo@sigov.org>; Carroll, Michael < carroll sigov.org> <br />Cc: Easter, Daniel <daniel.easter@aptim.com>; Tremblay, Cassandra <cassandra.tremblay@apti.com>; Hold, <br />Howard@Waterboards<Howard.Hold@waterboards.ca.gov> <br />Subject: RE: San Joaquin County's North County Landfill <br />J.C. and others, staff has reviewed the North County Sanitary Landfill documents. As requested in the letter dated 6 <br />March 2018, following installation of wells G-56, G-10, and G-11, San Joaquin County has performed the following: <br />? Installed wells G-513, G-10, and G-11, <br />? Developed wells G-513, G-10, and G-11 (submitted well development logs) <br />? Surveyed the Top of Casings of the newly installed wells, <br />? Measured depth to groundwater in the new wells on 29 March 2018 (submitted depth to groundwater field logs <br />with top of casing elevations), <br />? Prepared a Potentiometric Map using groundwater data from the newly installed wells and other existing wells <br />onsite, <br />? Determined groundwater flow direction from groundwater measurements taken on 29 March 2018, <br />? Conducted initial sampling of groundwater from wells G-513, G-10, and G-11 (provided the chain of custody as <br />proof of requested analysis including 5 -year COCs), <br />