Laserfiche WebLink
k -A <br />E <br />�j <br />Second Quarter 2018 <br />Structure Monitoring for Landfill Gas Results <br />North County Sanitary Landfill <br />Building and Monitoring Location <br />Methane <br />Carbon <br />Dioxide <br />Oxygen <br />Balance <br />Gas <br />,Office/Maint Building_ _(Electrical Box)_____ <br />Office/Main Building Interior (Downstairs Office) <br />iPumphouse (Electrical Conduit lnte• <br />-PumphouselElectrical Conduit Exterior)_ <br />Pumphouse <br />-(Interior) <br />Rec <br />_ycling Center (Interior) <br />,Recycling Center (Loading Dock) <br />iScalehouse (Electrical Conduit) <br />,Scalehouse (interior) <br />Monitoring Date: May 4, 2018 <br />Monitoring Technician: M. Calmes <br />