My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />3.06 ABANDONED BORINGS <br />SECTION 76 <br />SPECIAL <br />Page 7 of 12 <br />(02/17) <br />If an obstruction or other condition is encountered that prevents the drilling of a <br />well at the location identified, the Engineer may request that the Contractor <br />abandon the boring. If directed so, the Contractor shall fill the hole with neat <br />cement. Neat cement backfill shall be in the presence of EHD inspector. <br />3.07 WELL INSTALLATION <br />A. Well installation shall be in the presence of EHD inspector. Contractor shall <br />follow the guidelines for well inspection as specified herein.. <br />B. The Contractor shall measure the total depth of the borehole using a weighted <br />sounding line or other method as agreed with the Engineer and EHD inspector. If <br />heaving or cave-ins have taken place, then the Contractor shall clean out or <br />re -drill the borehole before well installation. <br />C. The well screens, bentonite seals and neat cement seals shall be installed in <br />accordance with the following sequence: <br />Contractor shall estimate the length of casings needed and verify with the <br />Engineer before lowering into the boring. Well casing shall be at least 5 feet <br />above grade. <br />2. Contractor shall not use couplings, or glue to join well casings. <br />3. Contractor shall install a PVC slip end cap or a well plug on the top of both <br />well casings before placing the casing in the bore hole. <br />4. Contractor shall connect and lower the well casing assembly gently. <br />5. If the well casing assembly is dropped, lowered abruptly, or for any other <br />reason suspected of being damaged during placement, the well casing <br />assembly shall be removed from the borehole for inspection by the Engineer. <br />The need to inspect the casing will be at the sole judgment of the Engineer. <br />6. If the well casing rises after being placed in the borehole, the Contractor <br />shall not place any drilling equipment such as drill pipe, hammers, etc. on <br />the casing to prevent the casing from rising. Contractor shall notify the <br />Engineer immediately of rising casing, and shall measure the amount of rise. <br />M a ►11 <br />LANDFILL AREA 513 -SEC 76 -GW Well Specs <br />
The URL can be used to link to this page
Your browser does not support the video tag.