My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />SECTION 76 <br />SPECIAL <br />Page 9 of 12 <br />(02/17) <br />17. Contractor shall try not to disturb the bentonite seal. <br />18. Contractor shall place neat cement in a single pour for wells up to 100 feet <br />deep. For wells deeper than 100 feet, the Contractor shall pour neat cement <br />in two pours, the second pour being at least 24 hours after the first pour. <br />19. Contractor shall place neat cement in the boring up to the existing grade. <br />Contractor shall allow neat cement to settle overnight. After neat cement <br />settlement, Contractor shall place additional neat cement to a level as <br />indicated in the construction figures. <br />20. Contractor shall install the well enclosure and do the surface completion only <br />after the neat cement has hardened. <br />D. Contractor shall record the following information on the well completion log: <br />1. Depth to water -bearing zones <br />2. Total depth of bore hole <br />3. Depth from ground surface to top and bottom of the well screen interval <br />4. Depth from ground surface to top of the sand pack interval <br />5. Depth from ground surface to top of the bentonite plug <br />6. Height above the ground surface of the top of the well casing <br />7. Height above the ground surface of the top of the steel protective casing. <br />3.08 SURFACE COMPLETION <br />A. Contractor shall clean well enclosure housing with high-pressure hot water/steam <br />prior to installation to ensure that it is free of contamination. <br />B. Contractor shall install well enclosure plumb. <br />C. Contractor shall cut the well casing pipe to minimum required height. The well <br />enclosure lid shall open and close smoothly providing space for pump discharge <br />tubing and pump lead wires. <br />D. Contractor shall remove the PVC end caps from the top of the casing and then <br />install well plugs. <br />E. Contractor shall place coarse sand in the annular space between the enclosure <br />and the well casings. The sand shall be placed six inches below the top of the <br />well casings. <br />SP -22 <br />LANDFILL AREA 5B -SEC 76 -GW Well Specs <br />
The URL can be used to link to this page
Your browser does not support the video tag.