Laserfiche WebLink
s <br />0 <br />FIELDWORK HEALTH & SAFETY PLAN (HASP) FOR FIELD INVESTIGATIONS OF PETROLEUM DISTILLATE FUELS <br />Drilling <br />• The drill rig is not to be operated in inclement weather. <br />• The driller is to verify that the rig is properly leveled and stabilized before raising the mast. <br />• Personnel should be cleared from the sides and rear of the rig before the mast is raised. <br />• The driller is not to drive the rig with the mast in the raised position. <br />• The driller must check for overhead power lines before raising the mast. A minimum distance of 10 feet between mast and overhead lines (<50 kV) is <br />required. Increased separation may be required for lines greater than 50 kV. <br />• Personnel should stand clear before rig startup. <br />- 6 - Revision: 7 — June 2013 <br />Down Hole Surveys/Cameras <br />safe work procedures, PPE, training <br />Batteries -jumping, servicing <br />safe work procedures, training, PPE <br />Tire Changing <br />safe work procedures, training, PPE <br />Maintenance <br />Engine Maintenance <br />safe work procedures, training, PPE, lockout <br />Refueling <br />safe work procedures, training, PPE <br />Servicing Pressure Systems <br />safe work procedures, training, PPE, lockout <br />Night Work(visibility) <br />proper lighting, safe work practices <br />Misc. - <br />Chemical Hazards <br />PPE, training, safe work practices <br />These <br />Noise <br />engineering, administration, PPE <br />types of <br />hazards <br />Dust <br />engineering, administration, PPE <br />may be <br />Working at Height <br />PPE, training, safe work procedures <br />found in <br />Equipment Fires <br />training, safe work procedures, safety inspections <br />some or all <br />Welding / Cutting <br />PPE, training, safe work procedures <br />of the <br />Wire Roe <br />PPE, training, safe work procedures <br />operations <br />Housekeeping <br />safe work procedures, safety inspections <br />listed <br />above. <br />Manual Handling <br />training, safe work procedures <br />Sampling <br />Traffic and forklift traffic to and from laboratory <br />Coordinate work closely between all site personnel. All lift trucks must have operating backup <br />with samples. <br />alarm. <br />Strain or crushing injury from moving heavy <br />Use proper lifting and unloading techniques. Use proper equipment and caution when <br />objects. <br />unloading or moving heavy objects. Wear leather gloves when moving heavy objects. <br />Failing objects and overhead hazards. <br />Wear hardhat at all times. Be aware of potential overhead equipment. <br />Slip/trip/fall on uneven surfaces or debris in the <br />Use caution and be aware of your surroundings. Maintain a clean work area. Wear steel toe <br />work area. <br />work boots. <br />Contusions, lacerations or strain from use of <br />Use the right tools for the job. Use tools that are in good working order. Wear leather gloves <br />hand tools. <br />when using hand tools. <br />Projectiles, eye irritation from blowing dust and <br />Wear proper PPE face during sampling <br />or chemical hazards <br />Exposure to chemical contaminants <br />Wear specified PPE. Follow site control procedures. Follow decontamination and hygiene <br />procedures. <br />Traffic hazard during mobilization of and <br />Coordinate work closely between CDLP and all other on-site personnel. All heavy equipment <br />operation of equipment <br />must have operating backup alarm. All personnel must watch for traffic between buildings. <br />Strain or crushing injury from unloading or <br />Use proper lifting and unloading techniques. Use proper equipment and caution when <br />moving heavy objects. <br />unloading or moving heavy objects. Non essential personnel to stay clear of areas where <br />hea objects are beingmoved. Wear leather loves when movingheavyobjects. <br />Decontamin <br />ation of <br />Slip/trip/fall surfaces or debris in the <br />Use caution and be aware of your surroundings. Maintain a clean work area. Wear steel toe <br />surfaces <br />work area. . Nail stiuneven <br />down And pipe <br />work boots and hard hats. <br />hanging <br />Contusions, lacerations or strain from use of <br />Use the right tools for the job. Use tools that are in good working order. Wear leather gloves <br />hand tools. <br />when using hand tools. <br />Noise near operating machinery <br />Use hearing protection per "Arms Length Rule." <br />Eye irritation from dust during cleaning <br />Wear safety glasses at all times during cleaning of petroleum and oils. Full face respirator <br />operation <br />required when cleaning areas containing metal dusts. <br />Fall hazards if climbing on roll -offs <br />Avoid climbing on roll -offs. <br />Repetitive motion injuries <br />Evaluate work station. Design work station to fit the individual. Vary work when possible. <br />Take breaks. Utilize proper keyboards. Use phone headsets. <br />Strain or crushing injury from moving objects. <br />Use proper lifting and unloading techniques. Use proper equipment and caution when <br />unloading or moving heavy objects. Wear leather gloves when moving heavy or rough <br />Office Work <br />objects. <br />Falling objects and overhead hazards. <br />Do not store heavy objects over head height. Utilize proper equipment such as ladders to <br />reach high objects. Clear personnel from surrounding area during overhead work. <br />Slip/trip/fall on uneven surfaces or debris in the <br />Use caution and be aware of your surroundings. Maintain a clean work area. Keep file <br />work area. <br />cabinet drawers closed. <br />Drilling <br />• The drill rig is not to be operated in inclement weather. <br />• The driller is to verify that the rig is properly leveled and stabilized before raising the mast. <br />• Personnel should be cleared from the sides and rear of the rig before the mast is raised. <br />• The driller is not to drive the rig with the mast in the raised position. <br />• The driller must check for overhead power lines before raising the mast. A minimum distance of 10 feet between mast and overhead lines (<50 kV) is <br />required. Increased separation may be required for lines greater than 50 kV. <br />• Personnel should stand clear before rig startup. <br />- 6 - Revision: 7 — June 2013 <br />