Laserfiche WebLink
• <br />FIELDWORK HEALTH & SAFETY PLAN (HASP) FOR FIELD INVESTIGATIONS OF PETROLEUM DISTILLATE FUELS <br />extremities, particularly the feet and hands. Frostbite symptoms include cold, tingling, stinging, or aching feeling in the frostbitten area followed by numbness and <br />skin discoloration from red to purple, then white or very pale skin. Should any of these symptoms be observed, wrap the area in soft cloth, do not rub the affected <br />area, and seek medical assistance. Call 911 if the condition is severe. <br />- Protective Clothing <br />Wearing the right clothing is the most important way to avoid cold stress. The type of fabric also makes a difference. Cotton loses its insulation value when it <br />becomes wet. Wool, on the other hand, retains its insulation even when wet. The following are recommendations for working in cold environments: <br />• Wear at least three layers of clothing. <br />o An outer layer to break the wind and allow some ventilation (like Gortex or nylon). <br />o A middle layer of down or wool to absorb sweat and provide insulation even when wet. <br />o An inner layer of cotton or synthetic weave to allow ventilation. <br />• Wear a hat—up to 40 percent of body heat can be lost when the head is left exposed. <br />• Wear insulated boots or other footwear. <br />• Keep a change of dry clothing available in case work clothes become wet. <br />• Do not wear tight clothing—loose clothing allows better ventilation. <br />- Work Practices <br />• Drinking—Drink plenty of liquids, avoiding caffeine and alcohol. It is easy to become dehydrated in cold weather. <br />• Work Schedule—If possible, heavy work should be scheduled during the warmer parts of the day. Take breaks out of the cold in heated vehicles. <br />• Buddy System—Try to work in pairs to keep an eye on each other and watch for signs of cold stress. <br />FIELD SAFETY PROCEDURES CHANGE AUTHORIZATION <br />This Safety Procedures Change Authorization Form will be completed and signed before any safety procedures identified in this Site Safety <br />Plan can be modified by the Field Team. <br />All revisions to safety procedures must be approved by the Project Manager. <br />Change <br />Number: <br />Date: <br />Duration of Task to be changed: <br />Description of Procedures <br />modification: <br />Justification: <br />Person Requesting Change: <br />Verbal Authorization Received From: <br />Name: <br />Name: <br />Title: <br />Title: <br />Signature <br />Approved by: <br />(Signature of person named above to be obtained within 48 hours of verbal <br />authorization) <br />-15- Revision: 7 — June 2013 <br />