Laserfiche WebLink
e . All hydrants shall be installed , inspected and tested prior to bringing combustible materials onsite , <br /> including storage . <br /> of. Knox boxes shall be required . The operator of the building shall immediately notify the Fire Authority <br /> and provide the new key where a lock is changed or rekeyed . The key to such shall be secured in <br /> the key box . <br /> g . Building and each tenant space shall be provided with approved address identification in <br /> accordance with CFC § 505 . <br /> h . Prior to final inspection , emergency radio responder coverage shall be tested to confirm coverage <br /> areas . It is beneficial for the applicant to conduct testing at foundation as retrofitting for the conduit <br /> is costly . If coverage is inadequate , a separate permit for emergency radio responder coverage <br /> shall be submitted to SSJCFA for review and approval prior to installation . <br /> 1 . Additional improvements may warrant additional testing to be performed . Testing shall be the <br /> determination of the fire code official . <br /> i . Additional comments may occur upon submittal of construction documents . <br /> 6 . AIR POLLUTION CONTROL DISTRICT ( Contact : [ 559 ] 230 -6000 ) <br /> a . Prior to commencing construction on any permit- required equipment or process , including odor <br /> control devices and electrical generators , a finalized Authority to Construct (ATC ) must be issued <br /> to the Project proponent by the District . <br /> b . Current District rules can be found online at : �P ww . valleyair . org/ rules / 1 rules list . htm . To identify <br /> other District rules or regulations that apply to this project or to obtain information about District <br /> permit requirements , the application is strongly encouraged to contact the District ' s Small <br /> Business Assistance ( SBA) Office at ( 209 ) 557 - 6446 . <br /> 7 . MOSQUITO & VECTOR CONTROL DISTRICT ( Contact : [209 ] 982 -4675 ) <br /> a . Applicant must incorporate mosquito prevention best management practices for the design , <br /> construction , operations and maintenance of the proposed stormwater pond . <br /> I . General Stormwater Management Mosquito Control BMPs : <br /> A . Ensure Mosquito Control Agencies have access to infrastructure to inspect or make <br /> appropriate treatments when necessary . <br /> Be Manage sprinkler and irrigation systems to minimize runoff entering stormwater <br /> infrastructure . <br /> C . Avoid intentionally running water into stormwater systems by not washing sidewalks <br /> and driveways , washing cars on streets or driveways , etc . <br /> D . Inspect facilities weekly during warm weather for the presence of standing water or <br /> immature mosquitoes . <br /> E . Remove emergent vegetation and debris from gutters and channels that accumulate <br /> water . <br /> F . Consider mosquito production during the design , construction , and maintenance of <br /> stormwater infrastructure . <br /> G . Design and maintain systems to fully discharge captured water in 96 hours or less . <br /> H . Include access for maintenance in system design . <br />