Laserfiche WebLink
SAN JOA UIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> Q <br /> i COUNTY --- - SITE APPROVAL <br /> Greatness grows here . <br /> FILE NUMBER . <br /> PERFORMANCE STANDARDS <br /> (Attach additional sheets as necessary) <br /> See Chapter 9= 1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction : <br /> Primary air pollutants would involve temporary fugitive dust and construction - related emissions <br /> during short-term construction activities . <br /> Please refer to the enclosed air quality and greenhouse gas emissions report prepared by Dudek . <br /> Noise <br /> Describe on -site sources of noise or vibration that may result from the proposedproject : <br /> Please refer to the enclosed noise technical report prepared by Dudek . <br /> Describe any machinery , equipment , or transportation noise that may result from the proposed project : <br /> Short-term construction noise would result from involve limited use of off- road construction equipment , <br /> delivery of materials via haul trucks , and workers travelling to and from the site . An operational noise assessment <br /> including battery storage operational noise is provided in the enclosed noise technical assessment prepared by Dudek . <br /> Light and Glare <br /> Describe any on -site sources of light and /or glare that may result from the proposed project : <br /> Existing onsite light sources include the PG & E substation lighting . Low- elevation ( < 14400t ) , controlled security lighting would be <br /> installed at the primary access gate along Flood Road , the Project substation , and the entrance to the battery storage structure . <br /> Lighting would only be switched on when personnel enter the area through a manual activation ( switch ) . Lighting would be only located <br /> in areas where it is required for safety , security , or operations , and would be directed on site and including shielding , as necessary . <br /> Odor <br /> Describe any on - site source of odor that may result from the proposed project : <br /> None anticipated . <br /> Page 5 of 6 <br /> Updated 08 / 28 / 2020 <br />