My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014301
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
24300
>
2600 - Land Use Program
>
PA-1700279
>
SU0014301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2022 8:58:08 AM
Creation date
7/19/2021 2:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014301
PE
2632
FACILITY_NAME
PA-1700279
STREET_NUMBER
24300
Direction
E
STREET_NAME
FLOOD
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
09310020, 24
ENTERED_DATE
7/19/2021 12:00:00 AM
SITE_LOCATION
24300 E FLOOD RD
RECEIVED_DATE
11/12/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION, MONITORING, AND REPORTING PLAN <br /> PA-1700279 <br /> WILLIAM E.JR.&MARILYN VAN TASSEL/NORTH CENTRAL VALLEY ENERGY STORAGE, LLC <br /> Impact Mitigation Measure/Condition Type of Review Agency for Action Verification of Compliance or <br /> Monitoring Indicating Annual Review of Conditions <br /> and Reporting Compliance <br /> Monitoring Reporting Compliance or Review By Date Remarks <br /> Air Quality <br /> MM-AQ-1 Between June 1 and November 30, when Valley X Engineering, 1) Review <br /> Fever rates of infection are the highest, additional Procurement Dust Control <br /> dust suppression measures (such as additional and Plan <br /> water or the application of additional soil stabilizer) Construction <br /> shall be implemented prior to and immediately (EPC) 2) EPC/Contra <br /> following ground-disturbing activities if wind contractor ctor shall <br /> speeds exceed 15 mph or temperatures exceed (monitoring); <br /> submit a <br /> 95°F for 3 consecutive days. The additional dust San Joaquin signed letter <br /> suppression shall continue until winds are 10 mph Valley Air verifying <br /> or lower and outdoor air temperatures are below Pollution <br /> 90°F for at least 2 consecutive days. The Control District compliance <br /> additional dust suppression measures shall be (oversight 3) Field <br /> incorporated into the Dust Control Plan. agency) verification <br /> MM-AQ-2 Prior to any Project grading activity, the primary X Engineering, 1) Review plan <br /> Project construction contractor shall prepare and Procurement <br /> implement a worker training program that and 2) EPC/Contra <br /> describes potential health hazards associated Construction ctor shall <br /> with Valley Fever, common symptoms, proper (EPC) submit a <br /> safety procedures to minimize health hazards, contractor signed letter <br /> and notification procedures if suspected work- (monitoring verifying <br /> related symptoms are identified during and plan compliance <br /> construction. The worker training program shall implementation) <br /> identify safety measures to be implemented by 3) Field <br /> construction contractors during construction. verification <br /> Safety measures will include the following: <br /> • Provide HEPA-filtered air-conditioned <br /> enclosed cabs on heavy equipment. <br /> Train workers on proper use of cabs, <br /> such as turning on air conditioning prior <br /> to using the equipment. <br /> PA-1700279— Mitigation, Monitoring, and Reporting Plan 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.