Laserfiche WebLink
SITE PIAN <br /> acre�e 9 <br /> Wetland Setback <br /> 'Site Access <br /> Property Settiack. -.. i: I ---- <br /> i <br /> ALJ. - '�, '100 fWetland Setback <br /> _Access Road` <br /> / <br /> TransinissiogLine �.\� /il . <br /> Right•of•Way �� 1 ! �. <br /> F- •�!' y� '• �'-_ v� 'ter • <br /> _ iii\ �� p 0 •� <br /> Fencelineo61 <br /> C <br /> a - <br /> Wetland Setback.- <br /> Inverter; <br /> Battery Storage Unit <br /> a. Access road would be used for fire agcess <br /> b.'North Central Valley Energy'Storage'total Limits of Disturbanbe=14.85 acres <br /> c, PG&E Bellota Substaion Expansion footprint=4.52 acres; <br /> d,, North Central Valley Energy Storage footprint=7.40 acres . <br /> 'Collector Substation botprint=approximately 11,000 s,f. 1 <br /> f. 'Size of 1 individual battery storage container unit=approximately 150 s.f. <br /> g. Up to 300 total battery containers proposed(up to approximately 45,000 s.f.) <br /> h. Size of 1 individual inverter=approximately 130 s.f. <br /> I. Up to 50 total inverter proposed(up to approximately 6,500 s.f.) <br /> SOURCE:Burns McDonnell Engineering 2021 <br /> D U D E K site Plan <br /> BellotaSubstatfon <br /> North Central Valley Energy Center <br />