Laserfiche WebLink
-2- <br />PA-2000196 (SA) <br />4)The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br />at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br />year by the Engineering Construction Cost Index as published by the Engineering News Record. <br />(Resolution R-00-433) <br />5)The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br />payable at the time of building permit application. The fee will be based on the current schedule at <br />the time of payment. (Resolution R-06-38) <br />6)The developer shall provide drainage facilities in accordance with the San Joaquin County <br />Development Standards. Retention basins shall be fenced with six (6) foot high chain link fence or <br />equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br />shall be calculated and submitted along with a drainage plan for review and approval, prior to <br />release of building permit. (Development Title Section 9-1135) <br />AC:CH