My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:48:52 PM
Creation date
7/20/2021 10:40:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JDARIN <br />y <br />Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />UNITED # 5447 <br />1469 E HAMMER LN, STOCKTON <br />August 05, 2021 <br />Other Violations <br />2010 <br />See below <br />Unlisted General violation <br />❑ V ❑ R ❑ COS <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />209 <br />CCR 2715(c)(3), 2715(c)(4) Failure to maintain a copy of the "Facility Employee Training Certificate" on-site. <br />OBSERVATION: The Facility Employee Training Certificate dated 7/26/2021 and 6/26/2021 did not list employee's <br />initial training dates (first date ever trained on the UST system). The column titled "Initial Training Dates" has the <br />date of the training listed instead of the employee's initial date of training. Date of training belongs in the bottom right <br />box next to the designated operator's signature. <br />REGULATION GUIDANCE: All site employees must be trained prior to taking responsibility as a facility employee if <br />after October 1, 2018, or within 30 days of hire if prior to October 1, 2018. The Facility Employee Training <br />Certificate shall contain accurate information for all employees trained. <br />CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br />submit a copy of the updated form to the EHD. <br />This is a minor violation. <br />302 <br />CCR 2630(d), 2641(a) Leak detection equipment not installed/maintained/located to detect leaks at earliest <br />opportunity. <br />OBSERVATION: The sensors in UDCs 1/2, 3/4, 7/8, 9/10 are not located at the lowest point of the UDC and not <br />located to detect a leak at the earliest opportunity. <br />- UDC 1/2, 3/4 have barriers from previous float and chains to contain leaks between the products. The barriers are <br />still in place with no openings to provide flow to the sensor. If a leak were to occur in the containments that the <br />sensor is not located in then the leak would not be detected due to the barrier preventing flow to the sensor. <br />- UDC 7/8, 9/10 have three open cups creating multiple low points. Each UDCs only have one sensor. The sensor is <br />located in one of the three open cups. Multiple cup openings with only one sensor in one of the cups does not allow <br />for leak detection at the earliest opportunity. <br />REGULATION GUIDANCE: Monitoring equipment shall be maintained to be able to detect a leak at the earliest <br />possible opportunity. <br />CORRECTIVE ACTION: Immediately relocate the sensors to the lowest point of UDC 12/2, 3/4, 7/8, 9/10 to allow <br />for leak detection at the earliest opportunity. <br />This is a repeat violation, Class II. <br />317 <br />CCR 2636(f)(2) Failure of the line leak detector to detect a 3.0 gph leak at 10 psi and restrict or shut off flow. <br />OBSERVATION: The 87 and 89 VMI line leak detector failed to detect a leak when tested. <br />REGULATION GUIDANCE: All line leak detectors shall be capable of detecting a 3 -gallon per hour leak at 10 psi. <br />CORRECTIVE ACTION: The service technician adjusted the leak detector, retested it, and it passed. <br />This is a repeat violation, Class ll. <br />FA0001570 PR0231126 SCO01 08/05/2021 <br />EHD 23-01 Rev. 9/16/2020 Page 4 of 5 Underground Storage Tank Program OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.