My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_WDR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
5950
>
4200 – Liquid Waste Program
>
PR0530041
>
_WDR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 8:37:59 AM
Creation date
7/22/2021 8:37:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
WDR
RECORD_ID
PR0530041
PE
4242
FACILITY_ID
FA0004443
FACILITY_NAME
CBUSO dba Woodbridge Winery
STREET_NUMBER
5950
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
Rd
City
Acampo
Zip
95220
APN
01709058
CURRENT_STATUS
01
SITE_LOCATION
5950 E Woodbridge Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER R5-2012-0103 - 14 - <br />CONSTELLATION BRANDS U.S. OPERATIONS, INC. dba WOODBRIDGE WINERY <br />WOODBRIDGE WINERY <br />SAN JOAQUIN COUNTY <br /> <br />39. Shallow soils consist of mixtures of sand, silt and clay. <br />40. Based on the California Department of Water Resources rainfall data, the mean <br />annual rainfall is approximately 15.2 inches and the 100-year return annual <br />precipitation is 31.9 inches. Evapotranspiration was estimated from a nearby <br />California Irrigation Management Information System monitoring station at 53.4 inches <br />per year. <br />41. Domestic wastewater generated at the winery is discharged to a septic system <br />regulated by the San Joaquin County Environmental Health Department. Sludge <br />produced in the treatment system is regularly pumped and disposed of off-site at a <br />domestic wastewater treatment facility. Septic tank effluent is discharged to a 17,280 <br />square foot leach field. An identically sized replacement area is permanently reserved <br />if needed in the future. <br />42. The primary process water supply is obtained from groundwater production wells. <br />Two wells (PW -1 and PW-4) produce all the facility process water under normal <br />conditions. Well PW -4 currently produces approximately five times the amount of <br />water produced by PW-1. The amount of water produced from the wells since 2003 is <br />presented below: <br /> <br /> <br /> <br />43. Water samples were collected from the supply wells (PW), irrigation wells (IW), and <br />water distribution system. A summary of the average results is presented below: <br />Well/ <br />Source <br />Average Result (mg/L, except as noted) <br />TDS Nitrate-N EC1 Sodium Chloride Sulfate <br />PW -1 184 0.8 240 13 6.1 4.2 <br />PW -2 413 0.9 691 33 28 9.1 <br />PW -3 266 0.9 386 19 13 6.4 <br />PW -4 135 0.8 166 11 3.7 4.7 <br />IW -1 345 3.8 496 30 25 17 <br />IW -2 250 1.5 337 16 9.5 5.0 <br />IW -3 433 4.3 634 26 18 45 <br />Year Units PW-1 PW-4 Total <br />2003 Mgal/year 3.96 82.9 86.86 <br />2004 Mgal/year 3.11 89.2 92.31 <br />2005 Mgal/year 5.95 87.3 93.25 <br />2006 Mgal/year 6.41 80.28 86.69 <br />2007 Mgal/year 4.33 57.96 62.29 <br />2008 Mgal/year 13.90 55.81 69.71 <br />2009 Mgal/year 11.00 54.93 65.93
The URL can be used to link to this page
Your browser does not support the video tag.