Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name:7-ELEVEN#20632,MKT 2368 Date of Testing: 12/15/2021 <br /> Facility Address:4627 DA VINCI DR @ MARCH LN,STOCKTON,CA 95207 <br /> Facility Contact:MGR-SATBIR(PTO#N-748) Phone:209-952-3543 <br /> Date Local Agency Was Notified of Testing: 12/13/2021 <br /> Name of Local Agency Inspector(if present during testing):LYDIA <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name:TANKNOLOGY INC. <br /> Technician Conducting Test:Landon Zamora <br /> Credentials): r- CSLB Contractor ICC Service Tech. T- SWRCB Tank Tester F Other(Specify) <br /> License Number(s): <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used By: F` Hydrostatic r- Vacuum Other <br /> Test Equipment Used:LAKE TEST I Equipment Resolution:0.0625 in. <br /> Spill Box#Tank 3 Spill Box#Tank 4 Spill Box#Tank 5 Diesel- <br /> Identify Spill Bucket(By Tank REGULAR-Fill 1-Direct- PREMIUM-Fill 1-Direct- Fill 1-Direct-Grade level Spill Box# <br /> Number,Stored Product, etc) Grade level in containment Grade level in containment <br /> in containment sump <br /> sump sump <br /> C" Direct Bury r Direct Bury C Direct Bury r Direct Bury <br /> Bucket Installation Type: (o Contained in Sump fo Contained in Sump fo Contained in Sump r Contained in Sump <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 15.00 15.00 15.00 <br /> Wait time between applying <br /> 5 min 5 min 5 min min <br /> vacuum/water and start of test <br /> Test Start Time(Tl): 09:00:00 09:00:00 09:00:00 <br /> Initial Reading(Rl): 14.00 in.H2O 14.00 in.H2O 14.00 in.H2O <br /> Test End Time(TF): 10:00:00 10:00:00 10:00:00 <br /> Final Reading(RF): 14.00 in.H2O 14.00 in.H2O 14.00 in.H2O <br /> Test Duration(TF—Tl): I hr 1 hr 1 hr <br /> Change in Reading(RF-Rl): 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date: 12/15/2021 <br /> 1 State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements may be more stringent. <br /> WO:2348912 <br />