Laserfiche WebLink
OPW 7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB-certified OPW 71 SO storage Tank (UST), properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve: Aluminum tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals: Viton® Delivery personnel should <br /> managed and trained <br /> a positive shut-off of product delivery. Upper & lower DropTube: Aluminum to <br /> inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts: Acetal and hoses for damaged and <br /> the drop tube used for gravity filling. 4 missing parts. They should <br /> Hardware: Stainless steel } always make certain there <br /> The OPW 7150 allows easy installation <br /> is a positive connection <br /> (without breaking concrete) and requires Features between the adaptor and <br /> no special manholes. . s elbow. If delivery equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid s ecial manholes re wired. coupled to the adaptor, a <br /> P q serious spill may result when <br /> level rises to about 95% of tank ♦ Economical — costs a fraction the DPW 7150 closes, causing <br /> capacity, the valve mechanism is of expensive, complicated and a hazard and environmental <br /> , <br /> released, closing automatically with P P contamination. <br /> the flow. This reduces the flow rate to difficult-to-install valves. <br /> approximately 5 gpm through a bypass • Furnished Complete — supplied NOTE: The DPW 71 SO is <br /> valve. The operator may then stop the with new upper P ,er and lower drop tubesdesigned for use on tight-fill <br /> gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95% level, the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets • Retrofits Directly — for both new <br /> is attempted. and no overrides to be broken and existing tanks with 4" fill risers. <br /> If the delivery is not stopped and the or abused. • Quick Drain Feature — <br /> liquid rises to about 98% of tank ♦ No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level. pressure is relieved. <br /> completely. No additional liquid can flow 40 Will Accept a Dipstick • Best Flow Rate in The Industry" <br /> into the tank until the level drops below <br /> a reset point. for Gauging OPW Test Lab results <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness response ors speed of res of the <br /> governing shut-off capacity in your P P Speeds Delivery Operations <br /> region, as well as take into account delivery attendant for certainty of _ product flows unimpeded into <br /> other considerations such as extreme overfill prevention. the tank until the hose " kick" that <br /> tank tilt. In all cases, the upper tube • Keeps the Top of UST "Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 112 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 7150 Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> Look for this label for <br /> Listings and = authentic OPW EVR <br /> 9 0 llbri �� sH-�.�� . <br /> Approvedp ducts. <br /> Certifications Resources Board Ca I DPW 71SO is EVA Approved for E85 <br /> 104 OIPW� _ , t , i tir - a „ <br />