My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1233
>
2300 - Underground Storage Tank Program
>
PR0547072
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 4:46:46 PM
Creation date
8/5/2021 11:01:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547072
PE
2351
FACILITY_ID
FA0026688
FACILITY_NAME
7-ELEVEN STORE # 41342
STREET_NUMBER
1233
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
CURRENT_STATUS
03
SITE_LOCATION
1233 E DR MARTIN LUTHER KING JR BLVD
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANO A Q U IN Environmental Health Department <br /> — COUNTY- <br /> 5, Provide written notification to ust@sjgov.org to arrange the following inspection appointments. <br /> All appointments must be scheduled 48 hours in advance. <br /> PRIOR TO BACKFILL <br /> a) Inspection of tank for brine leaks prior to tank placement in excavation. All tank pre-installation tests <br /> shall be performed according to tank manufacturer instructions. <br /> b) Verification of tank set, anchorage, appropriate backfill, and appropriate additional corrosion protection <br /> of tank anchors (turnbuckles, eye bolts, etc. ) . Additional corrosion protection is required on all exposed <br /> metal prior to covering . <br /> c) Primary tank test, according to manufacturer's specifications. <br /> d) Primary piping soap test of all piping and penetrations (product, vapor recovery, and vent) : One-hour <br /> pneumatic pressure test at 110% of operating pressure, or 40 psi, whichever is greater, in accordance <br /> with manufacturer installation instructions. <br /> e) Verification of secondary piping slope at 1 /8 inch per foot or greater, to a containment sump with an <br /> audible/visual alarm. <br /> f) Secondary piping soap test of all piping and penetrations (product, vapor recovery, and vent): One- <br /> hour pressure test at the manufacturer's recommended specification. <br /> g) Verification of all pipe setbacks, cross-overs, and burial depth according to the manufacturer's <br /> installation instructions and verification of appropriate piping backfill. <br /> h) Integrity testing of all sumps per the manufacturer's installation instructions. <br /> PRIOR TO FIRST FUEL DELIVERY <br /> i) Verification of leak monitoring communication for all installed vacuum , pressure, or hydrostatic (VPH) <br /> components including piping , sumps , under dispenser containment sumps (UDCs), and all chase lines. <br /> Communication at end points of each vacuum zone and each vacuum monitored sump must be <br /> verified independently in operating condition. <br /> j) Verification of the dispenser footprints contained by the UDCs. Any potential leaks from piping and <br /> fuel filters must drain directly into UDCs. <br /> k) Enhanced Leak Detection (ELD) testing, after facility is in operating condition. Appropriate test <br /> notification , tester certifications, and test method disclosure is required . Passing ELD test results must <br /> be received prior to receiving fuel . <br /> 1) Verification of VPH components installation (shroud boots and band clamps for spill containers, <br /> appropriate rubber-type gasket or clamps on lids on all fill, vent and STP sumps, etc. ) . <br /> m) Verification of overfill prevention: Measurement of drop tubes to verify 95% tank volume shut off and/or <br /> verification that external audible/visual alarm activates when tank is 90% full. <br /> n) Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic test (or equivalent) . <br /> Proper drainage method must be verified. <br /> o) Monitoring system functionality: Functionality of the monitoring system must be verified to ensure it <br /> meets the requirements of California Code of Regulations (CCR) Title 23 and California Health & <br /> Safety Code (HSC) Chapter 6. 7, <br /> PRIOR TO FINAL APPROVAL <br /> p) Leak detector test, after first fuel delivery: Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi . Leak detector monitored line volumes shall be appropriate <br /> for the make and model of the installed leak detectors, and shall be verified at the time of installation . <br /> q) PRIOR TO FINAL APPROVAL: Monitoring system functionality, after first fuel delivery, in operating <br /> condition: Functionality of the monitoring system must be verified to ensure it meets the requirements <br /> of CCR Title 23 and HSC Chapter 6.7. <br /> 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.